Research

Where the time goes

What six years of public appropriation and execution data can establish about the wait between a Department of Defense appropriation and an obligation — and, separately, what it cannot. Nine findings, thirteen recommendations, and the observation that would falsify each one.

Source
This site's own extracts, argued over in database/seed_research.json
Grain
One finding, one recommendation, or one resolved figure
Vintage
2026-09-19
Rows loaded
63

Path database/seed_research.json + every staged extract of the same load · extracted 2026-09-19 04:54 · refresh Every load

Limitations The figures move with the data even though the sentences do not: the prose is fixed and every number in it is resolved afresh at each load. The findings are this site's readings of its own published measurements, not the Department's, and they inherit every limitation of the sources beneath them. Recommendations are judgements rather than measurements and are labelled as such. The cost and horizon attached to each are estimates from the outside; nobody here has priced them from inside the Department.

The prose of this paper is written by hand and contains no literal numbers. Every figure below is a named placeholder resolved at load time from the same extracts the rest of this site publishes; control RES-01 rolls the load back if one fails to resolve.

Abstract

The standard account of Department of Defense execution says that continuing resolutions delay spending and that the delay reappears as a September rush. Six years of public data support neither half of that as a general claim. The measured effect of continuing-resolution length on execution timing is -1.6 days for the median operating account and -0.2 for the median investment account, both within two days of zero. The entire measured effect sits in 3 of 22 pairs, every one of them construction or family housing. Meanwhile September’s share of contract obligation has risen from 14.8% to 18.8% across the same six years, and the year with the second-longest continuing resolution, at 165 days, closed with the lowest September share of them all at 13.8%.

A second result runs the other way. Modelled from statute, regulation and the steps nobody publishes a clock for, the chain from a full-year act to a tenth of the post-act obligation being placed has a likely duration of 89 days. Components place that first tenth between 5 and 84 days after the act. Work is being staged against authority that has not arrived and released when it does, which means authority rather than capability is the binding constraint, and it means schedule bought by earlier authority is real rather than theoretical.

The third result is the one that limits the other two. Of the 10 steps between an appropriation and an obligation, 5 have no published deadline, no published date and no record of whether they were met — for any component, in any year. The Department cannot presently demonstrate whether the wait between authority and execution is funds distribution or acquisition lead time, and therefore cannot tell whether any corrective action worked. That is not an analytical gap on this site. It is the finding, and it is the cheapest one on this page to fix.

What this evidence base can see

A paper that does not state the shape of its own data invites the reader to assume it is complete. This one is not, and the limits are structural rather than temporary.

Department obligations
$1,451.5B
FY2025 · File A, Department scope only
Scope error if unfiltered
$108.7B (7.5%)
Summing every agency code in File A adds the Executive Office of the President
Contract dollars naming one account
8.5% – 24.4%
Worst to best year. Every colour-of-money timing statement rests on this sample
Chain steps with a published clock
5 of 10
The rest are modelled, and labelled as modelled on every row

Three populations, never mixed. Measured, complete: File A and File B carry every dollar, and one submission per fiscal year, so they contain no within-year timing at all. Measured, censored: contract action dates give a within-year ramp, but only for the small share of dollars that name a Treasury account, which makes every timing figure here an upper bound on how early money actually moved. Assumed: the interior of the distribution chain, which appears in no file available here. Nothing assumed is added to anything measured anywhere on this site.

Findings

Nine, in the order the argument needs them. Each carries the claim, what follows from it, the observation that would falsify it, and how far the evidence actually reaches.

  1. F1

    The appropriations calendar does not slow the Department down. It stops a named few.

    Across 22 component-and-colour-of-money pairs measured over six years, the median effect of a longer continuing resolution on execution timing is -1.6 days for operating accounts and -0.2 days for investment accounts — both within two days of zero. The entire measured effect sits in 3 pairs, every one of them construction or family housing, led by Navy family housing at +27.1 days later per thirty days of continuing resolution.

    So what

    A Department-wide continuing-resolution mitigation spends most of its effort on accounts that do not respond to it. The constraint is not that money moves slowly under a CR; it is that a CR bars new starts, and only some accounts need one.

    What would falsify it

    If operating accounts also slipped materially as CR length grew, the effect would be general and a Department-wide response would be right. They do not: Army operation and maintenance is -2.9 and Navy operation and maintenance -3.9 days per thirty.

    How far it reaches The direction is established over six years; the magnitude on the exposed pairs rests on very few observations each./execution/chain · /execution/timeline
  2. F2

    The Department executes faster than its own documented process would allow. Authority, not capability, is the binding constraint.

    Modelled from statute, regulation and the steps nobody publishes a clock for, the chain from a full-year act to a tenth of the post-act obligation being placed has a likely duration of 89 days. Observed, components place that first tenth between 5 and 84 days after the act.

    So what

    Work is being staged and held against authority that has not arrived, then released. That is the signature of a pipeline waiting on money rather than money waiting on a pipeline, and it means schedule recovered by earlier authority is real rather than theoretical.

    What would falsify it

    If components were capacity-constrained, post-act execution would lag the model rather than beat it, and the spread between components running the same statute in the same year would be small. It is not: the fastest and slowest components differ by a factor of several in the same year.

    How far it reaches Measured on the contract actions that name their Treasury account, so it is an upper bound on how early money moved./execution/chain
  3. F3

    5 of the 10 steps from an appropriation to an obligation have no published clock, so no remediation of it can be evaluated.

    Statute gives OMB thirty days from enactment to apportion and the regulation gives the component thirty more to allot — 60 days end to end, the only figure in the chain that comes from law alone. Of those 10 steps, 5 have no deadline, no published date and no record of whether they were met, for any component, in any year.

    So what

    The Department cannot currently demonstrate whether the wait between authority and execution is funds distribution or acquisition lead time. It therefore cannot tell whether any corrective action worked, which is the definition of an uncontrolled process.

    What would falsify it

    Four recorded dates per distribution action — apportionment, allocation, allotment, sub-allotment — would collapse the model's range to a measurement and settle it either way.

    How far it reaches The absence is certain; the interior durations on this site are explicitly assumptions and are labelled as such on every row./execution/chain
  4. F4

    Year-end concentration is rising, and it is not the continuing resolution doing it.

    September's share of the year's contract obligation rose from 14.8% in FY2021 to 18.8% in FY2025. It does not track the calendar: FY2022 ran 165 days without a full-year act, the second longest of the six years, and closed with the lowest September share of them all at 13.8%.

    So what

    Reading year-end concentration as evidence of continuing-resolution delay sends scrutiny in September at a problem that starts in October, and it is the easiest wrong inference available on this data.

    What would falsify it

    If the two moved together, the September series would rise with CR length across the six years. It does not.

    How far it reaches Measured on the full contract population, which is about a third of Department obligations and the only within-year series any published source here supports./execution/timeline · /execution
  5. F5

    The published record can test 1 of the Department's 26 material weaknesses.

    Scored assertion by assertion against what these files actually carry, 1 of the 26 audit-risk objects built around the FY2025 Agency-Wide material weaknesses is testable here, 7 are partial and 18 are absent. The published execution files exist to report budgetary execution to the public and carry no journal entry, no user, no trading partner, no receipt and no proprietary balance.

    So what

    A remediation programme built on public reporting cannot reach 18 of the 26 at all. It has to be built where the transactions are, and the absences are the finding rather than a gap in this site's coverage.

    What would falsify it

    An adjacent field existing is not the same as an assertion being testable, and this site does not soften an absent score because one does.

    How far it reaches The scoring is about THIS SITE's sources, not about the Department's own systems, and the page says so element by element./nfr · /sbr
  6. F6

    The trail between an award and the account that funded it is thin and getting thinner.

    A contract action names exactly one Treasury account on 24.4% of its dollars in its best year and 8.5% in its worst, and the attribution is at award level rather than action level. On the accounting side, File C links 5.9% of contract obligation in FY2021 and 1.1% in FY2026.

    So what

    Every timing statement about a colour of money in this Department is therefore an inference. So is any audit assertion that requires tracing an obligation to the appropriation that funded it — which is most of them.

    What would falsify it

    Measured across two warehouse vintages a month apart, the linkage share for a given fiscal year does not move, so this is a property of the source rather than a reporting lag that will fill in.

    How far it reaches Both figures are measured, and both are published beside every figure derived from them./linkage · /traceability · /execution/timeline
  7. F7

    The largest single mismeasurement risk in this data is a scope error, and it is trivially avoidable.

    File A carries several agency identifier codes, one of which is the Executive Office of the President. Summing them all and calling the result the Department overstates FY2025 obligations by $108.7B (7.5%) against a Department total of $1,451.5B. An earlier build of this site did exactly that while labelling the total as the Department.

    So what

    Analytical errors of this size do not come from sophisticated mistakes. They come from a filter nobody wrote, and the only reliable defence is a control that blocks the load rather than a convention people are asked to remember.

    What would falsify it

    The scope control asserts no Department-scope figure includes the Executive Office of the President, and it blocks the load. It has never been relaxed.

    How far it reaches Measured directly from the file./sources · /controls
  8. F8

    A falling notice count is not improvement, and the opinion has not moved across the whole published window.

    Notices issued ran 2,410 in FY2018 and 2,473 in FY2025; Agency-Wide material weaknesses went from 20 to 26 over the same period. The audit opinion in every one of those years was a disclaimer.

    So what

    A notice leaves the population when it is closed, when it is merged, when its entity stops being separately audited, or when the audit approach changes what is tested. Two of those happened inside the window. Reporting the count as a trend rewards the three mechanisms that are not remediation.

    What would falsify it

    If the count were tracking remediation, the material-weakness roster would fall with it. It rose for most of the window and the opinion never changed.

    How far it reaches Counts are as the Department's Inspector General published them; the roster pairing across renames is this site's and is published with the printed label beside every key./nfr · /audit
  9. F9

    Congressional conditions on obligation are managed as one category when only some of them stop money.

    Of the 9 conditions catalogued here, 4 actually bar obligation and the rest direct a report. The clearest bar carries no deadline at all: funds may not be obligated or expended until an execution plan reaches the committees, and nothing in the text says when that has to happen.

    So what

    A spend-plan direction and a clause reading none of these funds may be obligated are different instruments with different consequences, and treating them as one pile of congressional homework means the ones that actually hold money have no owner and no clock.

    What would falsify it

    A register separating bars from reports, with days-to-satisfaction measured against each bar, would settle how much money each one actually holds and for how long. Nothing measures that today.

    How far it reaches A curated selection read out of the acts and statements, not a mechanical extraction of every direction, and the page says so./execution/chain

The two figures the argument turns on

Both are drawn from the loaded tables behind the pages they came from, not restated here by hand.

Execution slip per thirty days of continuing resolution

One row per component and colour of money, ranked. Positive is later. The mass sits at zero; the effect is entirely in the top of the tail.

  • Navy · Family housing27.1
    4 years · investment
  • Navy · Military construction13.6
    4 years · investment
  • Army · Family housing12.5
    4 years · investment
  • Army · Military personnel3.3
    6 years · operating
  • Army · Procurement3.1
    6 years · investment
  • Air Force · Operation and maintenance2.8
    6 years · operating
  • Army · Military construction1.5
    6 years · investment
  • Defense-wide · Defense Health Program1.3
    6 years · operating
  • Navy · RDT&E1.2
    5 years · investment
  • Air Force · RDT&E0.1
    6 years · investment

Ranked by days of slip per thirty days without a full-year act. Only 3 of 22 pairs exceed five days; the median is -1.6 days for operating accounts and -0.2 for investment.

September’s share of the year’s contract obligation

Rising across six years. It does not track the appropriations calendar: the longest and second-longest continuing resolutions bracket the lowest and highest points.

0.0%10.8%21.6%FY21FY22FY23FY24FY25

Hover the line for a fiscal year.

Fiscal yearSeptember shareDays without a full-year act
FY202114.8%87
FY202213.8%165
FY202314.3%89
FY202417.5%174
FY202518.8%365

If year-end concentration were a continuing-resolution effect, these two columns would move together.

Recommendations

Thirteen, each naming exactly one finding above. A recommendation that cannot name a finding is an opinion, and this site does not print those beside measurements without saying which is which.

For the Department

OUSD(Comptroller) and the Deputy Secretary
1

Instrument the distribution chain with four dates

Capture and publish apportionment, allocation, allotment and sub-allotment dates per distribution action, from the systems that already create them, into the same reporting stream that carries obligations.

What it costs

No new system. These dates exist inside the funds-control chain today; what is missing is the requirement to retain and publish them.

How you would know it worked

The interior of the chain becomes measurement instead of assumption, and the model's range collapses. Until then no corrective action on funds distribution can be evaluated.

Authority
DoD FMR Volume 3, Chapter 2
2

Require the funding Treasury account on the contract action, not only on the award

Make the funding account a required field at action level in contract writing systems feeding the public files, and reconcile it to the accounting record.

What it costs

A field-level change in contract writing systems and the interfaces that feed them.

How you would know it worked

Coverage. Today a timing statement about a colour of money is an inference drawn from a small sample; at half coverage it becomes a measurement.

Authority
FAR Part 4; DFARS PGI 204
3

Stop reporting notice counts as remediation progress

Report the material-weakness roster and the condition behind each notice, paired across renames, rather than the count of open notices. Publish what closed and why it closed.

What it costs

A reporting change, not a remediation change.

How you would know it worked

Whether the roster falls. A count that falls while the roster does not is measuring attrition, not remediation.

Authority
OMB Circular A-123; FIAR guidance
4

Make scope a blocking control, not a convention

Any Department-wide figure built from the account files should be produced by a pipeline that refuses to publish when a non-Department agency code is inside the total.

What it costs

One assertion in whatever produces the figure.

How you would know it worked

The error cannot recur silently. A convention people are asked to remember will not survive a staff turnover; a control will.

For the military departments and defense agencies

Component comptrollers and major command resource managers
1

Scope continuing-resolution mitigation to construction and family housing

Build the CR playbook — anomaly requests, new-start exception lists, pre-award authorisations — around the accounts that actually move, and leave operating accounts out of it.

What it costs

Less effort than the Department-wide posture it replaces.

How you would know it worked

The slope on the exposed pairs. A mitigation that works pulls them toward the zero the rest of the Department already sits at.

2

Pre-position award-ready requirements against the enactment date

Run solicitation and source selection to the point authority permits during the continuing resolution, so the award is ready when the money is. Track design-complete-to-award separately from authority-to-award.

What it costs

Contracting workforce time spent earlier in the year rather than later.

How you would know it worked

Days from the act to the first tenth of post-act obligation. Components already differ by a factor of several on this, which is the evidence the practice varies and can be taught.

Authority
FAR Part 6
3

Measure your own pre-act pace, per colour of money, every year

Adopt the pace index — the average month before the full-year act against the year's own average month — as a standing execution metric at component level, not Department level.

What it costs

A query against data the component already holds.

How you would know it worked

The index itself. A component that cannot say whether it ran faster or slower than its own history cannot tell whether last year's mitigation worked.

4

Separate acquisition lead time from the appropriation problem in construction

For construction and family housing, treat the long wait from authority to first obligation as a design and solicitation cycle, and manage it as one. Do not charge it to funds distribution.

What it costs

A reporting split that most commands can make today.

How you would know it worked

Authority-to-first-obligation should fall toward the solicitation cycle rather than track the appropriations calendar.

For the appropriations committees

House and Senate Appropriations Committees, Defense Subcommittees
1

The new-start bar is the operative constraint. Consider targeted relief rather than general relief.

Where a continuing resolution is expected to run long, consider naming a limited set of new starts that may proceed, rather than either a blanket anomaly or nothing. The measured exposure is narrow enough to name.

What it costs

Committee time on a short list, against the alternative of a general anomaly or none.

How you would know it worked

Whether the exposed accounts' slope falls. The Department cannot currently produce that measurement, which is why the next recommendation matters more.

Authority
Continuing Appropriations Act, §102 and §104
2

Require the four distribution dates as a recurring deliverable instead of another spend plan

In place of an additional narrative spend plan, direct the Department to report apportionment, allocation, allotment and sub-allotment dates by account, on a recurring schedule, in machine-readable form.

What it costs

Lower than the spend plans it would replace, and it produces evidence rather than narrative.

How you would know it worked

Whether the committees can see, for the first time, where between enactment and obligation the time actually goes.

3

Put a deadline on every condition that bars obligation

Where a provision withholds funds until a document reaches the committees, state when the document is due. A bar with no deadline creates a wait bounded only by staffing.

What it costs

A clause.

How you would know it worked

Days from enactment to satisfaction, per bar. Not measured anywhere today.

Authority
Joint explanatory statements accompanying the annual act
4

Fund and direct monthly publication of the account files

Direct that the Account Balances and Program Activity and Object Class files be published for every submission period rather than annually, and that the public warehouse retain each period.

What it costs

The data already exists and is already submitted monthly. What is missing is publication and retention.

How you would know it worked

A monthly obligation and outlay series at full coverage would replace every inference on this site with a measurement — including the ones the committees are asked to rely on.

Authority
DATA Act; OMB Circular A-11
5

Require an obligating-document reference on the published execution files

Direct that the public execution files carry a reference tying each reported obligation to the document that created it.

What it costs

A field the Department's own systems already hold.

How you would know it worked

It is the single field that would make the largest number of audit assertions testable from public data. Without it, no published file can tie an obligation to the appropriation that funded it.

Authority
31 U.S.C. 1501

What would change these conclusions

Stated as tests rather than caveats, because a limitation nobody can act on is decoration.

Four recorded dates per distribution action

Apportionment, allocation, allotment and sub-allotment, published with the obligation data. This would replace the modelled interior of the chain with a measurement and settle, one way or the other, whether the wait is funds distribution or acquisition lead time. Every finding on this page about the chain is conditional on it.

The account files published monthly

The Department already submits them monthly; only the annual snapshot is published. A monthly series at full dollar coverage would replace the censored contract sample that carries every within-year figure here, and would likely revise the magnitude — though not, on this evidence, the direction — of the continuing-resolution result.

A funding account on the contract action

Attribution today is at award level, on a small share of dollars. Colour-of-money timing is therefore inference. At even half coverage it becomes measurement, and the three exposed account pairs could be confirmed or dismissed on far more than four observations each.

Days-to-satisfaction on each obligation bar

Nothing currently measures how long a spend-plan condition actually holds money, or how much. Without it, the claim that these conditions matter is an argument from their text rather than from their effect.

Two things this paper does not claim. It does not claim the Department is slow: on the only interval that is measured end to end, it is faster than its own documented process. And it does not claim its own sources are adequate — they are public reporting files built to report budgetary execution to the public, and asking them to carry audit evidence or funds-control timing is asking them to be something they were not built to be. Where they cannot answer, this paper says so rather than estimating.

Method

Short, because the detail belongs on the pages that produced each figure and is linked from every finding above.

Unit of analysis. Fiscal year × component × colour of money, for the year’s own appropriation — programme year equal to fiscal year. A fiscal year’s File A holds every programme year still executing in it, and a lag measured across that mixture answers nothing anyone asks.

Scope. Department only. File A carries several agency identifier codes and one of them is the Executive Office of the President; a blocking control refuses to publish any Department figure that includes it.

Statistics. Medians and a scaled median absolute deviation rather than means and standard deviations, because obligation amounts across these categories differ by three orders of magnitude and a shared threshold only ever selects the largest. Slopes are Theil–Sen, for the same reason.

Partial years. A year observed to day 168 is not compared against a closed year at day 365. Comparisons are truncated to the shortest window any year of that unit reaches, and a control enforces it.

The modelled interior. Where the chain has no published clock, each step carries a minimum, likely and maximum drawn from statute, regulation or practitioner description, is labelled with which of the three it is, and divides a measured residual. Nothing modelled is ever added to anything measured.

This page. The sentences are written by hand and contain no numbers. Every figure is a named placeholder resolved from the staged extracts at load time; the load fails if one does not resolve, or if a recommendation names a finding that no longer exists.

Appendix · every figure in this paper

The complete evidence table, in the order the paper resolves it. Value as extracted, beside the string the paper prints, so the rounding can be checked rather than taken on trust.

KeyWhat it isPrintedAs extractedSourceFY
dow_obligationsFY2025 Department obligations incurred$1,451.5B1,451,528,004,123.79File A2025
scope_yearThe last closed year20252025File A2025
scope_overstatementOverstatement from summing every agency code in File A$108.7B (7.5%)108,667,760,740.1099File A2025
sep_share_firstSeptember share of contract obligation, first year14.8%14.8428FPDS2021
sep_year_firstFirst year20212021FPDS—
sep_share_lastSeptember share, latest complete year18.8%18.7805FPDS2025
sep_year_lastLatest complete year20252025FPDS—
sep_share_2022FY2022 September share13.8%13.8029FPDS2022
cr_days_2022FY2022 days without a full-year act165165Appropriation calendar2022
single_tas_hiBest year for contract dollars naming one Treasury account24.4%24.3615FPDS2022
single_tas_loWorst year for the same8.5%8.4805FPDS2026
sens_pairsComponent and colour-of-money pairs with a measured slope2222FPDS + calendar—
sens_med_operatingMedian slope, operating accounts-1.6-1.65FPDS + calendar—
sens_med_investmentMedian slope, investment accounts-0.2-0.2FPDS + calendar—
sens_slip_countPairs slipping more than five days per thirty of continuing resolution33FPDS + calendar—
sens_worst_labelMost exposed pairNavy family housing—FPDS + calendar—
sens_worst_valueIts slope+27.127.1FPDS + calendar—
sens_army_omArmy operation and maintenance slope-2.9-2.9FPDS + calendar—
sens_navy_omNavy operation and maintenance slope-3.9-3.9FPDS + calendar—
chain_model_likelyLikely duration of the documented chain after a full-year act8989Statute + FMR—
chain_reg_ceilingEnactment to allotment, the ceiling law and regulation allow606031 U.S.C. 1513(b)(1); DoD FMR Volume 3—
post_act_loFastest component to a tenth of post-act obligation55FPDS—
post_act_hiSlowest component to the same8484FPDS—
chain_steps_totalSteps from an appropriation to an obligation1010Statute + FMR—
chain_steps_unpublishedOf those, with no published deadline55Statute + FMR—
gates_totalConditions catalogued between an appropriation and an obligation99Appropriations acts and statements—
gates_barOf those, that bar obligation44Appropriations acts and statements—
filec_firstFile C linkage, first year5.9%5.8929File C2021
filec_year_firstFirst year20212021File C—
filec_lastFile C linkage, latest year1.1%1.1028File C2026
filec_year_lastLatest year20262026File C—
nfrs_firstNotices issued FY20182,4102,410DoD OIG2018
mw_firstAgency-Wide material weaknesses FY20182020DoD OIG2018
nfr_year_firstYear20182018DoD OIG—
nfrs_lastNotices issued FY20252,4732,473DoD OIG2025
mw_lastAgency-Wide material weaknesses FY20252626DoD OIG2025
nfr_year_lastYear20252025DoD OIG—
nfr_objectsAudit-risk objects built at material-weakness grain2626DoD OIG + this site—
nfr_testableObjects scored testable against these sources11this site—
nfr_partialObjects scored partial against these sources77this site—
nfr_absentObjects scored absent against these sources1818this site—

41 figures. A key appearing here but not in any sentence above is dead evidence; a key in a sentence but not here fails the load.