Execution · Chain
Funds distribution and the execution lag
For the year's own appropriation: when the authority arrived and at what rate, when execution actually started and on what type of spending, how long each observable link took, and what a continuing resolution costs in execution days — measured from this Department's own six years rather than asserted.
- Source
- File A + File B + FPDS action dates + the curated appropriation calendar
- Grain
- Fiscal year x component x colour of money x object class major group
- Vintage
- 2026-08-06
- Rows loaded
- 6,574
Path accounts/file_a, accounts/file_b, contracts/, database/seed_approp_calendar.json · extracted 2026-09-19 04:54 · refresh With the warehouse; the calendar changes when a law is enacted
Limitations Apportionment, allocation, allotment and sub-allotment are published nowhere here, so only the endpoints of the chain are observed and the interior is an assumption with its authority printed beside it. The ramp is censored: only 1-6% of current-year dollars name their Treasury account, the attribution is award-level rather than action-level, and an earlier obligation that named no account is invisible. File A and File B hold one submission per fiscal year and contain no within-year series at all.
Own-year money only · FY2021–FY2026
Four bases, and which one every figure comes from
This page mixes measurement and assumption on purpose, because the question cannot be answered without both. What it must never do is let them blur, so each figure says which it is.
Measured · complete
File A and File B
Budget authority, resources, obligations, outlays, by object class. Every dollar — and one submission a fiscal year, so no within-year timing exists in them at all.
Measured · dated
The appropriation calendar
Enactment, continuing-resolution and lapse dates, each cited to its public law. Day-level.
Measured · censored
The execution ramp
Contract action dates against named accounts. An UPPER BOUND: 0.4% of FY2026 own-year obligations are visible this way, and the attribution is award-level.
Assumed
The interior of the chain
Apportionment, allocation, allotment and sub-allotment appear in no file available here. Only the endpoints are observed; the interior divides a measured residual.
Nothing assumed is ever added to anything measured. CHN-03 blocks a load where a unit assigns days to a step it never waited on, and CHN-01 ties every analytic unit back to File A’s own obligations for the year’s own money. The chain interior is the one part of this page that no control can verify, because there is nothing published to verify it against — which is itself the finding in section 5.
1 · One component, one colour of money, end to end
Authority, execution and the chain on the same day axis, because the whole point is that they line up. Day 1 is 1 October.
1 · When the money was there, and how much
Both ends are File A figures. Under a continuing resolution the account carries authority at the prior year’s annualised rate, which is the rule that shapes the middle; at enactment it carries its own enacted amount for the first time. Under a lapse it carries nothing.
- 2025-10-01 · d1lapse$0K[measured] No appropriation of any kind is in force. Obligation is barred except for excepted activities.
- 2025-11-12 · d43CR$140.03B[derived] The lapse ends and a continuing resolution takes effect. Authority is shown at the prior year's annualised rate, accrued from 1 October.
- 2026-01-31 · d123lapse$0K[measured] A second lapse. Authority already accrued remains obligated-against only for excepted activity; no new authority arrives.
- 2026-02-03 · d126enacted$1047.16B[measured] The full-year appropriation act is signed. The account carries its own enacted budget authority for the first time.
2 · When each type of spending actually moved
Each bar runs from the day a tenth of that object class’s observed obligation had been made to the day nine tenths had, with the median marked. Measured on contract actions that name this account, so it is an upper bound: an earlier obligation that named no account is invisible here. The first action is shown too, and it is deliberately not the measure — something obligates on 1 October in almost every year.
3 · The chain, against the process that is supposed to run it
Two chains run in every one of these years, and which one governs a dollar depends on what the dollar is for. A continuing requirement has authority from 1 October at the prior year’s rate, OMB having apportioned automatically by bulletin, so only distribution and contracting remain. A new start is barred outright until the full-year act, and then the whole chain runs from the enactment date. The model below is built from the documented process and is never re-fitted to the observation; the verdict is how the two compare.
- measuredAppropriation in force—CongressThe full-year act is signed. Under a continuing resolution the account already holds authority at the prior year's annualised rate, so this step has already happened and the chain below starts from 1 October instead. Public law
- estimateFunding authorization document generated, staffed and signed3–21 dOUSD(C) appropriation manager, SES approvalThe FAD is drafted, staffed and signed, then issued to the Military Service or Defense Agency. This is the step that turns an apportionment into authority a component can actually distribute, and it has no published clock. DoD FMR Volume 3, Chapter 2
- regulationAllotment to the major command5–30 dComponent comptroller → major commandThe regulation is explicit here and nowhere else in the interior: allotments shall be made no later than 30 days after OMB signs the apportionment, or the start of the subsequent calendar month, whichever is later. Note the clock runs from OMB's signature, so it OVERLAPS the recording and FAD steps above rather than following them. DoD FMR Volume 3, Chapter 2
- estimateSub-allotment to the installation or fund centre3–25 dMajor command → fund centreThe command sub-allots to the organisation that holds the requirement. Nothing published records when this happens, for any component, in any year. DoD FMR Volume 3, Chapter 2
- estimateCommitment and solicitation5–60 dFund centre → contracting activityThe fund centre commits the funds and the contracting activity solicits. On an existing vehicle this is short; where competition is required it is the longest step in the chain and it is acquisition lead time rather than funds distribution. DoD FMR Volume 3, Chapter 15; FAR Part 6
- measuredFirst obligation recorded—Contracting activityA contract action is signed and the obligation is recorded. The second measured endpoint. FPDS action date
- The component request, OUSD(C) review, OMB apportionment and recording steps are not shown for this chain: under a continuing resolution OMB apportions automatically by bulletin, so they do not run at all.
Statute allows OMB 30 days from enactment to apportion and the regulation allows 30 more to allot, so 60 days from enactment to allotment is the ceiling law and regulation together permit. It is the one figure in this section that comes from neither estimate nor observation.
- measuredAppropriation in force—CongressThe full-year act is signed. Under a continuing resolution the account already holds authority at the prior year's annualised rate, so this step has already happened and the chain below starts from 1 October instead. Public law
- statuteComponent submits its apportionment request3–15 dMilitary Department or Defense Agency → OUSD(C)The component builds and submits its SF 132. Statute allows the agency until 15 days after enactment and A-11 asks for 10 calendar days; the component's own internal staffing sits inside that window. 31 U.S.C. 1513(b)(1); OMB Circular A-11 §120.23
- estimateOUSD(C) reviews and forwards to OMB2–12 dOUSD(C)/P&FC → OMBOUSD(C) consolidates the Department's requests, reconciles them against the enacted act and forwards the SF 132 to OMB. No published deadline governs this step, and it is one of the two places a Department-side delay would sit. DoD FMR Volume 3, Chapter 2
- statuteOMB apportions — SF 132 signed5–30 dOMBOMB must notify the agency of its apportionment action within 30 days of enactment. It is a manual, document-by-document action. Under a continuing resolution OMB apportions automatically by bulletin (A-11 §123), which is why operating accounts obligate from the first day of a CR year. 31 U.S.C. 1513(b)(1)
- estimateOUSD(C) records the approved apportionment1–7 dOUSD(C)/P&FCThe approved position is recorded in the Department's funds control system. Nothing can be distributed against an apportionment that has not been posted. DoD FMR Volume 3, Chapter 2
- estimateFunding authorization document generated, staffed and signed3–21 dOUSD(C) appropriation manager, SES approvalThe FAD is drafted, staffed and signed, then issued to the Military Service or Defense Agency. This is the step that turns an apportionment into authority a component can actually distribute, and it has no published clock. DoD FMR Volume 3, Chapter 2
- regulationAllotment to the major command5–30 dComponent comptroller → major commandThe regulation is explicit here and nowhere else in the interior: allotments shall be made no later than 30 days after OMB signs the apportionment, or the start of the subsequent calendar month, whichever is later. Note the clock runs from OMB's signature, so it OVERLAPS the recording and FAD steps above rather than following them. DoD FMR Volume 3, Chapter 2
- estimateSub-allotment to the installation or fund centre3–25 dMajor command → fund centreThe command sub-allots to the organisation that holds the requirement. Nothing published records when this happens, for any component, in any year. DoD FMR Volume 3, Chapter 2
- estimateCommitment and solicitation5–60 dFund centre → contracting activityThe fund centre commits the funds and the contracting activity solicits. On an existing vehicle this is short; where competition is required it is the longest step in the chain and it is acquisition lead time rather than funds distribution. DoD FMR Volume 3, Chapter 15; FAR Part 6
- measuredFirst obligation recorded—Contracting activityA contract action is signed and the obligation is recorded. The second measured endpoint. FPDS action date
Statute allows OMB 30 days from enactment to apportion and the regulation allows 30 more to allot, so 60 days from enactment to allotment is the ceiling law and regulation together permit. It is the one figure in this section that comes from neither estimate nor observation.
4 · Every dollar, by type of execution
File B, direct obligations, this unit’s own-year money. Complete — and carrying no timing at all, which is why it sits beside the censored ramp above rather than inside it.
| Type of execution | Obligated | Outlaid | Undelivered | Outlay rate |
|---|---|---|---|---|
| Pay and benefits | $408.13B | $400.66B | $3.31B | 98% |
| Contractual services | $238.23B | $111.22B | $121.35B | 47% |
| Equipment | $101.43B | $41.71B | $58.51B | 41% |
| Supplies and materials | $43.84B | $29.40B | $15.54B | 67% |
| Travel and transport | $18.11B | $10.52B | $6.02B | 58% |
| Rent, comms and utilities | $15.51B | $8.47B | $6.62B | 55% |
| Land and structures | $7.42B | $630M | $6.73B | 8% |
| Grants and claims | $2.42B | $1.06B | $1.26B | 44% |
| Undistributed | $1.56B | $1.60B | $63M | 103% |
| Printing | $535M | $247M | $276M | 46% |
| Investments and loans | $60K | $50K | $10K | 83% |
| Other | $-368K | $95M | $-6K | -25861% |
2 · What a continuing resolution actually costs in execution days
Each component and colour of money regressed against the number of days its year ran without a full-year act. Theil-Sen rather than least squares: with five or six observations one unusual year sets an ordinary slope, and two of these six years are unusual. Every year is compared over the same window — the shortest any year of that unit reaches — so a live year measured over fewer days does not read as running early.
The Department and its components, all colours of money together
| Scope | Window | Years | Days later per 30 days of CR |
|---|---|---|---|
| Department of War (all components) | 218 d | 6 | -3.4 |
| Air Force — all colours of money | 218 d | 6 | +0.4 |
| Navy — all colours of money | 213 d | 6 | -1.0 |
| Army — all colours of money | 217 d | 6 | -2.7 |
| Defense-wide — all colours of money | 218 d | 6 | -4.0 |
Rolled up, the effect disappears entirely: the Department as a whole and every component sit within a few days of zero. That is not the same as saying nothing is affected — it is the arithmetic of a small number of exposed accounts inside a very large total, which is exactly why the table below is the one to act on.
Component by colour of money
| Component | Colour of money | Profile | Window | Years | Days later per 30 days of CR |
|---|---|---|---|---|---|
| Navy | Family housing | investment | 345 d | 4 | +27.1 |
| Navy | Military construction | investment | 363 d | 4 | +13.6 |
| Army | Family housing | investment | 113 d | 4 | +12.5 |
| Army | Military personnel | operating | 209 d | 6 | +3.3 |
| Army | Procurement | investment | 64 d | 6 | +3.1 |
| Air Force | Operation and maintenance | operating | 218 d | 6 | +2.8 |
| Army | Military construction | investment | 79 d | 6 | +1.5 |
| Defense-wide | Defense Health Program | operating | 217 d | 6 | +1.3 |
| Navy | RDT&E | investment | 361 d | 5 | +1.2 |
| Air Force | RDT&E | investment | 204 d | 6 | +0.1 |
| Defense-wide | Operation and maintenance | operating | 218 d | 6 | -0.4 |
| Air Force | Family housing | investment | 114 d | 5 | -0.5 |
| Defense-wide | Procurement | investment | 211 d | 6 | -1.3 |
| Army | RDT&E | investment | 365 d | 5 | -1.3 |
| Air Force | Procurement | investment | 198 d | 6 | -1.8 |
| Army | Operation and maintenance | operating | 217 d | 6 | -2.9 |
| Navy | Operation and maintenance | operating | 213 d | 6 | -3.9 |
| Navy | Procurement | investment | 72 d | 6 | -4.4 |
| Defense-wide | RDT&E | investment | 211 d | 6 | -5.3 |
| Defense-wide | Other | operating | 351 d | 5 | -7.8 |
| Air Force | Military personnel | operating | 184 d | 6 | -11.4 |
| Air Force | Military construction | investment | 350 d | 5 | -30.2 |
A positive figure means execution slipped later as the continuing resolution ran longer. A negative one means it did not, and several are negative: an account whose requirements already exist obligates at the prior year's rate whether or not the new act has passed. CHN-05 re-derives every slope in SQL from the points it was taken over, sharing no code with the extract that published it.
The shape of this table is the finding, and it is not the one an execution review usually starts from. Both medians sit within two days of zero, so a continuing resolution has no effect on most of the Department that this data can detect. The effect lives entirely in the tail, and the tail is construction and family housing. The negative rows are not noise either: an account whose requirements already exist obligates at the prior year’s rate whether or not the new act has passed, and several of them obligate earlier in a long continuing resolution, which is what carrying a backlog into October looks like.
Two cautions on reading it. The three exposed pairs have four observations each, so the direction is better established than the magnitude. And Air Force military construction at the bottom of the table, at -30.2 days, is a single-account series whose sign is set by two years; it is published because deleting an inconvenient row is how a table stops being evidence, not because it is believed.
3 · Where the wait actually is
The measured gap between the day a unit first had authority and the day a tenth of its observed year had been obligated. Both ends are measured; nothing here is assumed.
The longest measured waits
| FY | Unit | Authority | 10% executed | Gap |
|---|---|---|---|---|
| 2023 | Defense-wide · Military construction | day 1 | day 356 | 355 d |
| 2024 | Defense-wide · Military construction | day 1 | day 349 | 348 d |
| 2025 | Army · Military construction | day 1 | day 309 | 308 d |
| 2021 | Air Force · Military construction | day 1 | day 302 | 301 d |
| 2024 | Army · Family housing | day 1 | day 287 | 286 d |
| 2023 | Army · Other | day 1 | day 265 | 264 d |
| 2025 | Army · Family housing | day 1 | day 260 | 259 d |
| 2023 | Air Force · Procurement | day 1 | day 257 | 256 d |
| 2022 | Navy · Family housing | day 1 | day 253 | 252 d |
| 2022 | Defense-wide · Military construction | day 1 | day 250 | 249 d |
| 2025 | Air Force · Military construction | day 1 | day 247 | 246 d |
| 2021 | Defense-wide · Procurement | day 1 | day 239 | 238 d |
Construction and family housing dominate, and that is the honest reading: their wait is design, solicitation and source selection, not a funds distribution delay. The chain profile in section 1 charges it accordingly.
Units that executed before the authority arrived
| FY | Unit | Authority | 10% executed | Ahead by |
|---|---|---|---|---|
| 2026 | Air Force · Operation and maintenance | day 43 | day 13 | 30 d |
| 2026 | Air Force · Family housing | day 43 | day 31 | 12 d |
| 2026 | Army · Military personnel | day 43 | day 37 | 6 d |
| 2025 | Air Force · Military personnel | day 1 | day 1 | 0 d |
Almost all of these are FY2026, where the year opened with a 43-day lapse and operating accounts kept obligating anyway — on excepted activity and on carried-in balances. It is the clearest evidence on the page that operating execution is not gated by the new appropriation.
4 · After the act: how long until the money that had to wait actually moved
The new-start chain. Obligation that could only follow the full-year act, measured from the day it was signed, against the process model built from statute, regulation and the steps nobody publishes a clock for.
| FY | Component | Act signed | First tenth placed | Days after the act | Against the model |
|---|---|---|---|---|---|
| 2023 | Air Force | day 90 | day 174 | 84 d | within the model |
| 2023 | Army | day 90 | day 166 | 76 d | within the model |
| 2022 | Army | day 166 | day 236 | 70 d | within the model |
| 2023 | Defense-wide | day 90 | day 160 | 70 d | within the model |
| 2021 | Army | day 88 | day 146 | 58 d | within the model |
| 2021 | Defense-wide | day 88 | day 139 | 51 d | within the model |
| 2023 | Navy | day 90 | day 139 | 49 d | within the model |
| 2021 | Air Force | day 88 | day 128 | 40 d | within the model |
| 2022 | Navy | day 166 | day 201 | 35 d | within the model |
| 2024 | Army | day 175 | day 209 | 34 d | within the model |
| 2021 | Navy | day 88 | day 117 | 29 d | within the model |
| 2026 | Navy | day 126 | day 154 | 28 d | within the model |
| 2026 | Defense-wide | day 126 | day 153 | 27 d | within the model |
| 2024 | Navy | day 175 | day 201 | 26 d | ahead by 1 d |
| 2026 | Army | day 126 | day 149 | 23 d | ahead by 4 d |
| 2022 | Defense-wide | day 166 | day 188 | 22 d | ahead by 5 d |
| 2024 | Defense-wide | day 175 | day 194 | 19 d | ahead by 8 d |
| 2022 | Air Force | day 166 | day 181 | 15 d | ahead by 12 d |
| 2026 | Air Force | day 126 | day 140 | 14 d | ahead by 13 d |
| 2024 | Air Force | day 175 | day 180 | 5 d | ahead by 22 d |
The model's likely path — every step at its typical duration — totals 89 days. Most components beat it, and that is the finding: the work was staged and waiting on authority rather than starting when the authority arrived. 2 chains run beyond it.
Read the spread rather than the level. Both components are inside a model that runs from 27 to 200 days, which is wide enough that “within the model” is a weak statement on its own. The useful comparison is between components running the same statute in the same year, and there the difference is real and consistent.
5 · What the law puts between an appropriation and an obligation
Conditions in appropriations law and the joint explanatory statements. Two kinds, and conflating them is the commonest error in this area: a BAR prevents obligation until the condition is met; a reporting direction burdens the Department without, on its own words, withholding the money.
What a gated account looks like in the execution data
The FY2026 agreement attaches a 60-day spend plan to Golden Dome. File A can isolate that account, so the scope is measured rather than asserted: it received $8.2B of budget authority and obligated $0.02B, 0.2%, in its year of appropriation, then $19.18B of $21.12B, 90.8%, in the year after. That is the shape a gated new fund makes. The direction and the slow year are not the same event \u2014 the money was appropriated before this act, and a first-year investment fund executes slowly for many reasons. What this shows is the pattern, not a cause.
“The agency submits its apportionment request by the later of 40 days before the fiscal year begins or 15 days after enactment; the President notifies the agency of the apportionment action by the later of 20 days before the fiscal year begins or 30 days after enactment.”
Funds cannot be distributed before they are apportioned. Thirty days is the statutory ceiling on OMB, not a target, and it runs from enactment rather than from receipt of the request.
31 U.S.C. 1513(b)(1) \u00b7 source
A continuing resolution funds projects and activities at the prior year's rate and bars new starts, multi-year procurements and production-rate increases. An activity for which no appropriation was available in the prior year cannot be obligated against at all until the full-year act.
This is the single most consequential gate on this site, and it is the mechanism behind the continuing-resolution finding in section 2: operating accounts keep obligating at the prior year's rate through a CR because their requirements already exist, and construction and family housing cannot, because a project that has not started is precisely what the CR bars.
Continuing Appropriations Act, 2026, §102 and §104 \u00b7 source
The Department's Financial Management Regulation requires prior congressional approval of reprogramming actions above dollar or percentage thresholds agreed with the congressional defense committees. General transfer authority is separately capped by the act: $6,000,000,000 between appropriations for military functions other than military construction in the FY2024 act.
The specific thresholds by appropriation type are not published in the source this site could reach, so they are not stated here. The transfer ceiling is quoted for FY2024, the year the source states; it is set annually and this site has not verified the FY2026 figure.
DoD FMR Volume 3, Chapter 6; annual Department of Defense Appropriations Act, §8005 \u00b7 source
“The agreement directs that none of these funds may be obligated or expended until the Under Secretary of Defense (Comptroller), in coordination with the Commander, USAFRICOM, presents an execution plan to the congressional defense committees.”
The clearest example on this page of a true bar rather than a reporting direction: the money exists and cannot be touched until a document reaches the committees. It carries no deadline, so the wait is as long as the staffing takes.
Joint Explanatory Statement, Department of Defense Appropriations Act, 2026 \u00b7 source
“Allotments shall be made no later than 30 days after OMB signs the apportionment or the start of the subsequent calendar month, whichever is later.”
The only step in the interior of the distribution chain with a published deadline. Note the clock runs from OMB's signature, so it overlaps the recording and funding-authorization-document steps rather than following them: statute and regulation together allow 60 days from enactment to allotment.
DoD FMR Volume 3, Chapter 2 \u00b7 source
OMB apportions continuing-resolution funding automatically by bulletin, at a pro-rata share of the annualised prior-year rate: rate for operations multiplied by the days the continuing resolution covers, divided by 365.
This is why a continuing resolution does not stop operating execution. The apportionment steps of the chain do not run at all: the authority is already apportioned on 1 October. It is also the rule this site uses to draw the authority curve under a continuing resolution.
OMB Circular A-11 §123 \u00b7 source
“To that end, the Secretary of Defense is directed, in conjunction with the Director of Golden Dome, to provide a comprehensive spend plan for Golden Dome resourcing to the congressional defense committees, not later than 60 days after enactment of this Act.”
Measured scope: $8.2B budget authority, $29.3B resources, $19.2B obligated across FY2025, FY2026 \u2014 account 097-2025/2029-3007-000.
A direction to report rather than a bar on obligation in its own words. The account it names is the one large enough to see in File A, which is why this site can measure its scope instead of asserting it.
Joint Explanatory Statement, Department of Defense Appropriations Act, 2026 \u00b7 source
“Further, the agreement directs that not later than 60 days after the enactment of this Act, the Secretary of the Army shall submit a comprehensive spend plan for amounts made available for JIATF-401.”
Sits inside Army accounts rather than in one of its own, so File A cannot isolate its scope and this site does not guess at it.
Joint Explanatory Statement, Department of Defense Appropriations Act, 2026 \u00b7 source
“The agreement directs the Secretary of Defense, in consultation with the Commander, United States Indo-Pacific Command, to provide the House and Senate Defense Appropriations Subcommittees, not later than 60 days after the enactment of this Act, with a spend plan and briefing on the Taiwan Security Cooperation Initiative.”
A reporting direction with a deadline rather than a bar.
Joint Explanatory Statement, Department of Defense Appropriations Act, 2026 \u00b7 source
This is a selection read out of the acts and statements, not a mechanical extraction of every congressional direction, and it says so. Reprogramming thresholds by appropriation type are not published in any source this site could reach, so no figure is given for them. Where a gate sits inside a component’s accounts rather than in one of its own, File A cannot isolate it and the scope is left empty rather than estimated \u2014 GATE-01 fails a load that claims a measured scope without naming the account it was measured on.
6 · What the shapes themselves say
Execution ramps clustered by their own shape rather than by a category assigned in advance, and each unit-year scored against its own history. Deterministic: the same load gives the same archetypes, and the centroid rides on every row so a reader can see what the cluster actually is.
Execution archetypes
Even through the year
84
unit-years
Half the year’s obligation placed by fiscal month 5.
Front-loaded
42
unit-years
Half the year’s obligation placed by fiscal month 3.
Back-loaded
35
unit-years
Half the year’s obligation placed by fiscal month 7.
Unit-years furthest from their own history
| Deviation | What moved | Sample | Prior median sample | Years |
|---|---|---|---|---|
| -11.2 | FY2026 Air Force operation and maintenance placed half its observed obligation on day 59 against a 5-year median of 134 | $0.7B | $1.4B | 5 |
| -7.5 | FY2024 Defense-wide procurement placed half its observed obligation on day 87 against a 3-year median of 139 | $0.4B | $0.0B | 3 |
| +7.4 | FY2024 Army military construction placed half its observed obligation on day 67 against a 3-year median of 34 | $0.1B | $0.0B | 3 |
| -7.3 | FY2026 Defense-wide defense health program placed half its observed obligation on day 72 against a 5-year median of 115 | $0.3B | $0.4B | 5 |
| -6.8 | FY2024 Air Force military construction placed half its observed obligation on day 201 against a 3-year median of 304 | $0.1B | $0.1B | 3 |
| -6.6 | FY2024 Air Force operation and maintenance placed half its observed obligation on day 90 against a 3-year median of 134 | $2.3B | $1.4B | 3 |
| -6.6 | FY2024 Air Force procurement placed half its observed obligation on day 53 against a 3-year median of 160 | $0.0B | $0.0B | 3 |
| -6.0 | FY2026 Army operation and maintenance placed half its observed obligation on day 73 against a 5-year median of 126 | $0.7B | $1.0B | 5 |
| -5.8 | FY2024 Defense-wide rdt&e placed half its observed obligation on day 110 against a 3-year median of 155 | $0.5B | $0.1B | 3 |
| -5.6 | FY2026 Air Force procurement placed half its observed obligation on day 69 against a 5-year median of 160 | $0.2B | $0.0B | 5 |
| +5.2 | FY2025 Air Force family housing placed half its observed obligation on day 108 against a 3-year median of 77 | $0.0B | $0.0B | 3 |
| -5.1 | FY2026 Army all colours placed half its observed obligation on day 72 against a 5-year median of 133 | $0.8B | $2.3B | 5 |
Median and scaled median absolute deviation against the unit's own prior years, scale floored at 5% of the median and the result capped at 99 \u2014 never against a Department average, because these categories differ by three orders of magnitude. The two sample columns are the point: a cell whose dated sample collapsed shifts its own median for reasons that have nothing to do with execution, and several rows here are exactly that. CHN-09 re-derives every baseline in SQL.
7 · Root cause
Why the pattern looks the way it does, and what each explanation would predict that this data can check.
A continuing resolution bars new starts, and a construction project is all new start
- What supports it
- Every pair that slips more than 5 days per 30 days of CR is construction or family housing, and those same accounts dominate the measured-wait table. A project that cannot be started cannot be obligated against, and there is no continuing requirement underneath it to keep obligating in the meantime.
- What cuts against it
- It does not generalise to investment money as a class: the investment median is -0.2 days, statistically indistinguishable from the operating median of -1.6. Procurement and RDT&E, which also need new starts, do not show the effect.
- What this data can say
- Right for construction and housing, wrong as a statement about investment accounts generally. The distinction matters because it decides where mitigation goes.
Acquisition lead time sets the level; the appropriation sets the variance
- What supports it
- Design, solicitation and source selection for a construction project take the better part of a year regardless of when the money arrived. That produces exactly what is seen: a long baseline wait that shifts modestly with the calendar.
- What cuts against it
- If lead time were the whole level, the slope would be zero and it is not — Navy family housing and military construction both move materially with CR length.
- What this data can say
- The best available reading. Level is acquisition; variance is appropriation. They need different remedies and are currently managed as one problem.
The distribution chain itself is slow
- What supports it
- The classic explanation, and the one the Department's own workforce reports.
- What cuts against it
- Nothing here can test it. Apportionment, allocation, allotment and sub-allotment are published in no file available to this site, so the interior of every chain on this page is an assumption sitting inside a measured residual.
- What this data can say
- Untestable with public data. That is a finding about instrumentation, not a verdict on the chain.
The ramp is an artefact of which contracts name their account
- What supports it
- Only 0.4% of FY2026 own-year obligations are visible in the dated ramp, and the account is attributed at award level rather than action level.
- What cuts against it
- The pattern is stable across six years and reverses cleanly between operating and investment accounts. A coverage artefact would not produce a sign change that tracks the economics.
- What this data can say
- A real limit on precision, not on the direction. Every ramp figure is labelled an upper bound.
8 · Courses of action
Four, ordered by the ratio of what they would change to what they would cost. Each names the evidence it rests on and how you would know it worked.
Aim continuing-resolution mitigation at construction and family housing
- Do
- Build the CR playbook — anomaly requests, new-start exception lists, pre-award authorisations — around the 3 pairs that actually move: Navy family housing, Navy military construction, Army family housing. Do not spend the request capital on operating accounts.
- Because
- Measured over six years, the median slope is -1.6 days for operating accounts and -0.2 for investment accounts — no detectable effect either way. Every pair above 5 days is construction or family housing. A Department-wide CR mitigation spends most of its effort on accounts that do not respond to it.
- Know it worked
- The slope on those three pairs. Re-run it each year; a mitigation that works pulls them toward the zero the rest of the Department already sits at.
Instrument the distribution chain so the argument can be settled
- Do
- Capture and publish four dates per funds-distribution action — apportionment, allocation, allotment, sub-allotment — from the systems that already create them, into the same reporting stream that carries obligations.
- Because
- Six of the nine steps in section 1 have no published clock at all. Statute gives OMB 30 days to apportion and the regulation gives the component 30 more to allot — 60 days end to end — and nothing records whether either was met, for any component, in any year. The Department cannot currently demonstrate whether the wait between authority and execution is distribution or acquisition, which means it cannot tell whether any remediation worked.
- Know it worked
- The model in section 1 spans 27–200 days for the enacted chain because six of its steps are estimates. Four recorded dates per distribution action would collapse that range to a measurement, and the estimate rows would disappear from this page.
Separate the acquisition-lead-time problem from the appropriation problem
- Do
- For construction and family housing, move design and solicitation ahead of appropriation where authority permits, so the award is ready when the money is. Track design-complete-to-award separately from authority-to-award.
- Because
- These accounts carry 200-350 day waits from authority to first tenth even in years enacted in December. That level is not a funding delay and will not respond to funding remedies.
- Know it worked
- Authority-to-first-tenth for those units should fall toward the solicitation cycle rather than track the calendar.
Triage the legislative gates by whether they actually bar obligation
- Do
- Maintain a single register of the conditions that gate obligation, separating the 4 that bar it from the reporting directions that do not, and put a named owner and a due date against each bar. Section 5 is the starting inventory.
- Because
- A direction to submit a spend plan and a clause reading 'none of these funds may be obligated or expended until' are managed today as one category of congressional homework. Only the second stops money moving, and the USAFRICOM clause carries no deadline at all, so its wait is as long as the staffing takes.
- Know it worked
- Days from enactment to the condition being met, per bar. It is not currently measured anywhere.
Fix account attribution on contract actions
- Do
- Require the funding Treasury account on the action, not only on the award, in contract writing systems feeding the public files.
- Because
- Execution timing is currently measurable on 0.4% of own-year obligations. Every timing figure on this page is an upper bound because of it, and no amount of analysis fixes a coverage problem.
- Know it worked
- Coverage. At 50% the ramp stops being an upper bound and becomes a measurement.
Nothing on this page observes impropriety and nothing on it establishes causation. A consistent association between the appropriation calendar and the shape of execution, measured over six years against each unit’s own history, is what these files support. The mechanism is what a programme office, a comptroller and a contracting activity would have to be asked — which is the point of course of action 2.
9 · What this page cannot do, stated plainly
So that the next person does not rediscover it.
- There is no monthly File A or File B. The warehouse holds one submission per fiscal year and the files themselves carry one period: the “P01-P12” in a download’s filename is the request range, not its content. A true monthly obligation curve at full coverage would need each period requested separately, which is a fetch rather than a code change.
- File C is quarterly here, not monthly. It carries eleven period labels but only four of them hold content, and it reaches a few per cent of contract dollars.
- Commitments are not published at all. The step between a fund centre receiving money and an obligation being recorded is invisible in every file on this site.
- The ramp cannot see payroll. Pay and benefits move on a schedule through no contract action, so the one type of execution with no timing question in it is also the one the dated sample barely contains. That is why the complete File B table sits beside the ramp rather than inside it.
The companion page, fund distribution and the execution timeline, takes the same calendar and reads it against all contract obligations by fund holder, where coverage is complete and the colour of money is not available. The two answer different halves of the same question.
The argument these pages add up to, with what follows from it for the Department, the components and the appropriations committees, is written up at Where the time goes.