Weapon system · Missile Defense Programs
Terminal High Altitude Area Defense
What the Department publishes for this system, and what the budget lines tied to it actually add up to. Held in 5 weapons books; 2 budget lines in the P-1 and R-1 exhibits reach it on evidence.
- Source
- DoD Comptroller President's Budget justification books, PB2020-PB2027
- Grain
- Budget line item x President's Budget year x fiscal year
- Vintage
- 2026-08-24
- Rows loaded
- 108,317
Path knowledge-bank/DOD-FM-Knowledge-Bank/11-Budget-Justification/_Archive · extracted 2026-09-19 04:53 · refresh annual, on publication of each President's Budget
Limitations The P-1R exhibit is National Guard and Reserve equipment already counted inside the P-1 lines, and R-1 rows marked Include-in-TOA = N sit outside total obligation authority; both are kept, flagged is_memo, and excluded from every total. Amounts are in thousands of dollars as published, are total obligation authority rather than outlays, and are not comparable to the execution files without ageing prior-year balances. The link from a weapons-book system to a budget line is derived from shared type designators or shared significant words -- neither source carries the other's key -- and every link records the evidence it rests on.
The weapons book publishes in millions of dollars and the -1 exhibits in thousands; both are shown here in dollars. Every figure is a request, an enactment or an actual as the book states it — never a mixture.
What the Department publishes for this system · PB2026
Program Acquisition Cost by Weapon System states, on one page per system, the RDT&E and procurement cost of that system split by service, with quantities, for the three fiscal years the book restates. It is the only source here that states what a whole programme costs rather than what one budget line costs.
| Appropriation | Service | FY2024 actual | FY2025 enacted | FY2026 requested |
|---|---|---|---|---|
| Procurement | subtotal | $216.8M | $247.0M | $840.1M |
| RDT&E | subtotal | $241.2M | $311.0M | $684.7M |
| System total | as the book prints it | $457.9M11 units | $557.9M12 units | $1.5B37 units |
As printed on page 4-3 of the PB2026 book. Read down to the Total: the subtotals are the book's own, and adding a subtotal to the services beneath it would count the same money twice.
The book changes shape between eras — PB2020 and PB2021 split the budget year into base and OCO, PB2026 into discretionary and mandatory — so the figure for a year is the right-most column the book labels Total, and where it labels none, the sum of that year’s components. Which rule produced each figure is recorded on the row. A right-most-column rule on its own would publish the PB2026 mandatory add as the whole year. Control WBC-01 asserts each page foots to its own printed total.
Where that money sits in the budget
The published system total is one number. The exhibits spread the same request across separate budget lines — the airframe on one, its modifications on another, its spares and support equipment on a third, its development in the R-1 entirely — and each of those lines is appropriated separately and executed in a different Treasury account.
| Budget line | Fund type | Appropriation | Category · J-book | Exhibit · line item | Newest request | Tied to this system by |
|---|---|---|---|---|---|---|
| TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD) | Procurement | Missile Procurement, Army021-2032 | Surface-to-Air Missile System | P1 · 8046C20200 | $11.4B | shared wording: altitude, area, defense, high |
| Terminal High Altitude Area Defense (THAAD) RDTE | RDT&E | Research, Development, Test and Evaluation, Army021-2040 | — | R1 · 0605058A | $1.1B | shared wording: altitude, area, defense, high |
Every line here is tied to this system by the evidence in the last column, and each can be rejected on its own without disturbing the rest. An ambiguous designator produces no row at all — 'PATRIOT P3I' yields P-3, which is the Orion, so it is refused rather than filed under a maritime patrol aircraft.
The two figures, side by side
| Fund type | What the book publishes for the system | What the tied budget lines total | Lines | Reached |
|---|---|---|---|---|
| All appropriations | $1.5B | $0 | 2 | 0.0% |
Both are FY-request figures from the same book, so they are answering the same question. The book’s own blocks are grouped here as RDT&E or procurement — a page that prints a separate “Mods” block is counted on the procurement side, which is where that money is appropriated — while the total row is the book’s own. Control WBC-02 reports both directions of the gap and closes neither.
The tied lines fall short of the published total, and the shortfall is a statement about the crosswalk rather than about the money. A system’s spares, modification, support-equipment and post-production lines are separate budget lines whose titles frequently carry no shared designator — “Aircraft Spares and Repair Parts” names no aircraft — so they cannot be tied back on evidence and are not counted here. The missing money was appropriated; this site simply cannot prove which line it is on. Neither figure is a life-cycle cost. Both are a single year’s request for procurement and development, and neither includes the operation, maintenance or military-personnel money that sustains a fielded system — those sit in appropriations these exhibits do not cover at all.
Into execution: the accounts these lines are appropriated to
File A carries budgetary resources, obligations incurred, unobligated balance and outlays at Treasury account grain — the account-level status of budgetary resources. It is the furthest this system can be followed, and it is followed as accounts, never as a system.
021-2032 · Missile Procurement, Army
| Fiscal year | Budgetary resources (D+R) | Obligations (D+R) | Direct (File B) | Reimbursable (File B) | Direct rate | Unobligated | Gross outlays |
|---|---|---|---|---|---|---|---|
| FY2021 | $6.1B | $4.9B | $4.5B | $419.9M | 77.5% | $1.2B | $4.9B |
| FY2022 | $8.2B | $5.3B | $5.1B | $216.5M | 63.4% | $2.9B | $4.3B |
| FY2023 | $12.1B | $9.3B | $8.9B | $356.5M | 76.3% | $2.8B | $4.5B |
| FY2024 | $13.4B | $7.3B | $6.8B | $552.6M | 54.6% | $6.1B | $5.4B |
| FY2025 | $15.2B | $10.8B | $10.2B | $575.1M | 68.1% | $4.4B | $5.4B |
| FY2026 * | $17.6B | $8.8B | $8.5B | $302.8M | 64.3% | $8.8B | $5.9B |
021-2040 · Research, Development, Test and Evaluation, Army
| Fiscal year | Budgetary resources (D+R) | Obligations (D+R) | Direct (File B) | Reimbursable (File B) | Direct rate | Unobligated | Gross outlays |
|---|---|---|---|---|---|---|---|
| FY2021 | $64.5B | $56.5B | $14.2B | $42.3B | 69.5% | $8.0B | $38.7B |
| FY2022 | $60.3B | $52.5B | $14.2B | $38.3B | 56.4% | $7.8B | $58.0B |
| FY2023 | $34.1B | $28.3B | $17.7B | $10.5B | 63.6% | $5.8B | $36.0B |
| FY2024 | $31.6B | $24.6B | $16.9B | $7.7B | 68.1% | $7.0B | $23.2B |
| FY2025 | $30.5B | $24.3B | $16.4B | $7.9B | 69.0% | $6.2B | $22.8B |
| FY2026 * | $46.4B | $20.7B | $15.1B | $5.7B | 57.9% | $25.7B | $19.8B |
This is where the chain stops being about this system. These are whole-account figures: every budget line in the account is inside them, and File A carries no budget line at all, so no part of an account obligation can be attributed to this system. Obligations are also not outlays, and the outlays include payment against prior-year obligations. A year marked * is period-to-date rather than a closed year. Where the chain breaks is the page about this.
Why searching for an abbreviation finds this system
Every abbreviation carried here is one the weapons book itself expands into this system's own name, and the sentence it was read from is printed beside it.
| Abbreviation | How it was read | The book’s own words | Book |
|---|---|---|---|
| THAAD | expanded in the system’s description, sharing its name | “The Terminal High Altitude Area Defense (THAAD)” | PB2026 |
Control WBC-03 refuses any abbreviation that names no evidence. No synonym is invented on this site, and no figure is ever aggregated through this table — it steers a search and nothing else.