datamatter
FY2027 requestJustificationWrite a J-book
Budget to executionFund distribution & timelineDistribution chain & lagFunds controlContractingBy programAssistance
Traceability breakLinkageReconciliationAudit postureFindings & NFRsSBR assuranceCongressional
Ask the corpusSourcesRaw dataDefinitionsControlsRegulatory search
Research

Weapon system · Shipbuilding & Maritime Systems

Medium and Large Unmanned Surface Vessels

What the Department publishes for this system, and what the budget lines tied to it actually add up to. Held in 4 weapons books; 3 budget lines in the P-1 and R-1 exhibits reach it on evidence.

Source
DoD Comptroller President's Budget justification books, PB2020-PB2027
Grain
Budget line item x President's Budget year x fiscal year
Vintage
2026-08-24
Rows loaded
108,317

Path knowledge-bank/DOD-FM-Knowledge-Bank/11-Budget-Justification/_Archive · extracted 2026-09-19 04:53 · refresh annual, on publication of each President's Budget

Limitations The P-1R exhibit is National Guard and Reserve equipment already counted inside the P-1 lines, and R-1 rows marked Include-in-TOA = N sit outside total obligation authority; both are kept, flagged is_memo, and excluded from every total. Amounts are in thousands of dollars as published, are total obligation authority rather than outlays, and are not comparable to the execution files without ageing prior-year balances. The link from a weapons-book system to a budget line is derived from shared type designators or shared significant words -- neither source carries the other's key -- and every link records the evidence it rests on.

The weapons book publishes in millions of dollars and the -1 exhibits in thousands; both are shown here in dollars. Every figure is a request, an enactment or an actual as the book states it — never a mixture.

← the rosterShipbuilding & Maritime Systemsalso written USVbook: PB2023PB2024PB2025PB2026

What the Department publishes for this system · PB2026

Program Acquisition Cost by Weapon System states, on one page per system, the RDT&E and procurement cost of that system split by service, with quantities, for the three fiscal years the book restates. It is the only source here that states what a whole programme costs rather than what one budget line costs.

FY2026 requested
$129.6M
97.3 units
Budget lines tied to it
3
across 2 Treasury accounts
Those lines total
$1.2B
FY2026 request, non-memo, from the PB2026 book
Which is this much of it
919.2%
of the published system total — a measure of the crosswalk, not of the money
AppropriationServiceFY2024 actualFY2025 enactedFY2026 requested
RDT&Esubtotal$284.4M$178.2M$129.6M
System totalas the book prints it$284.4M$178.2M$129.6M97.3 units

As printed on page 6-10 of the PB2026 book. Read down to the Total: the subtotals are the book's own, and adding a subtotal to the services beneath it would count the same money twice.

The book changes shape between eras — PB2020 and PB2021 split the budget year into base and OCO, PB2026 into discretionary and mandatory — so the figure for a year is the right-most column the book labels Total, and where it labels none, the sum of that year’s components. Which rule produced each figure is recorded on the row. A right-most-column rule on its own would publish the PB2026 mandatory add as the whole year. Control WBC-01 asserts each page foots to its own printed total.

Where that money sits in the budget

The published system total is one number. The exhibits spread the same request across separate budget lines — the airframe on one, its modifications on another, its spares and support equipment on a third, its development in the R-1 entirely — and each of those lines is appropriated separately and executed in a different Treasury account.

Budget lineFund typeAppropriationCategory · J-bookExhibit · line itemNewest requestTied to this system by
Medium Unmanned Surface Vehicle (MUSVs)ProcurementOther Procurement, Navy017-1810Small BoatsP1 · 0954$171.1Mshared wording: medium, surface, unmanned
Large Unmanned Surface Vehicles (LUSV)RDT&EResearch, Development, Test and Evaluation, Navy017-1319—R1 · 0603178N$57.9Mshared wording: large, surface, unmanned
MEDIUM UNMANNED SURFACE VEHICLES (MUSVs))RDT&EResearch, Development, Test and Evaluation, Navy017-1319—R1 · 0605512N$39.4Mshared wording: medium, surface, unmanned

Every line here is tied to this system by the evidence in the last column, and each can be rejected on its own without disturbing the rest. An ambiguous designator produces no row at all — 'PATRIOT P3I' yields P-3, which is the Orion, so it is refused rather than filed under a maritime patrol aircraft.

The two figures, side by side

Fund typeWhat the book publishes for the systemWhat the tied budget lines totalLinesReached
Procurement—$1.1B1—
RDT&E$129.6M$97.3M275.1%
All appropriations$129.6M$1.2B3919.2%

Both are FY-request figures from the same book, so they are answering the same question. The book’s own blocks are grouped here as RDT&E or procurement — a page that prints a separate “Mods” block is counted on the procurement side, which is where that money is appropriated — while the total row is the book’s own. Control WBC-02 reports both directions of the gap and closes neither.

The tied lines carry more than the book states for this system, and that is not extra money: a budget line can be broader than one programme. A single R-1 program element can fund several systems, and a procurement line can carry an item the weapons-book page leaves out — the Next Generation Squad Weapon ammunition line is the clearest case. The exhibits publish no split inside a line, so nothing here apportions one, and the excess is shown rather than trimmed away. Control WBC-02 names every system where this happens. Neither figure is a life-cycle cost. Both are a single year’s request for procurement and development, and neither includes the operation, maintenance or military-personnel money that sustains a fielded system — those sit in appropriations these exhibits do not cover at all.

Into execution: the accounts these lines are appropriated to

File A carries budgetary resources, obligations incurred, unobligated balance and outlays at Treasury account grain — the account-level status of budgetary resources. It is the furthest this system can be followed, and it is followed as accounts, never as a system.

017-1810 · Other Procurement, Navy

Fiscal yearBudgetary resources (D+R)Obligations (D+R)Direct (File B)Reimbursable (File B)Direct rateUnobligatedGross outlays
FY2021$13.9B$11.5B$11.3B$209.1M82.2%$2.4B$10.1B
FY2022$14.3B$11.5B$11.4B$74.2M80.4%$2.8B$10.3B
FY2023$15.9B$12.5B$12.4B$97.7M79.1%$3.3B$11.0B
FY2024$19.2B$14.8B$14.7B$152.5M77.1%$4.4B$11.9B
FY2025$27.0B$17.6B$17.4B$197.0M64.6%$9.5B$13.2B
FY2026 *$26.6B$15.3B$15.2B$136.7M58.3%$11.3B$12.0B

017-1319 · Research, Development, Test and Evaluation, Navy

Fiscal yearBudgetary resources (D+R)Obligations (D+R)Direct (File B)Reimbursable (File B)Direct rateUnobligatedGross outlays
FY2021$23.7B$21.0B$20.4B$640.8M88.6%$2.7B$20.0B
FY2022$25.8B$22.1B$21.7B$442.2M85.5%$3.7B$20.3B
FY2023$30.8B$26.5B$26.0B$498.2M85.5%$4.4B$23.5B
FY2024$34.0B$29.6B$29.0B$517.6M86.6%$4.4B$27.0B
FY2025$36.8B$27.9B$27.4B$505.9M75.5%$8.9B$26.2B
FY2026 *$41.5B$28.1B$27.7B$392.9M69.3%$13.4B$23.3B

This is where the chain stops being about this system. These are whole-account figures: every budget line in the account is inside them, and File A carries no budget line at all, so no part of an account obligation can be attributed to this system. Obligations are also not outlays, and the outlays include payment against prior-year obligations. A year marked * is period-to-date rather than a closed year. Where the chain breaks is the page about this.

Why searching for an abbreviation finds this system

Every abbreviation carried here is one the weapons book itself expands into this system's own name, and the sentence it was read from is printed beside it.

AbbreviationHow it was readThe book’s own wordsBook
USVexpanded in the system’s description, sharing its name“The Unmanned Surface Vessel (USV)”PB2026

Control WBC-03 refuses any abbreviation that names no evidence. No synonym is invented on this site, and no figure is ever aggregated through this table — it steers a search and nothing else.

Built on public USASpending data and a curated DoD financial-management knowledge bank. No controlled unclassified information is present on this site, and none transits it. Every figure names its source and vintage; see Sources and Controls.

© 2026 datamatter