Budget · the program roster
Every budget line in the President’s Budget
The P-1 and R-1 exhibits are the only source here keyed to a budget line rather than to a Treasury account, which makes them the spine everything else hangs from. Eight books are held, PB2020 through PB2027, and each one restates three fiscal years — so a single year appears three times with three different numbers, and all three are kept.
- Source
- DoD Comptroller President's Budget justification books, PB2020-PB2027
- Grain
- Budget line item x President's Budget year x fiscal year
- Vintage
- 2026-08-24
- Rows loaded
- 108,317
Path knowledge-bank/DOD-FM-Knowledge-Bank/11-Budget-Justification/_Archive · extracted 2026-09-19 04:53 · refresh annual, on publication of each President's Budget
Limitations The P-1R exhibit is National Guard and Reserve equipment already counted inside the P-1 lines, and R-1 rows marked Include-in-TOA = N sit outside total obligation authority; both are kept, flagged is_memo, and excluded from every total. Amounts are in thousands of dollars as published, are total obligation authority rather than outlays, and are not comparable to the execution files without ageing prior-year balances. The link from a weapons-book system to a budget line is derived from shared type designators or shared significant words -- neither source carries the other's key -- and every link records the evidence it rests on.
Amounts are total obligation authority as published, in thousands of dollars, converted here to dollars. They are not outlays and are not comparable to an execution figure without ageing prior-year balances.
What is held
Eight President's Budget books, three fiscal years each, at the grain the exhibits publish.
Why every year appears three times
A -1 exhibit is not a snapshot. Each book carries the prior year's actuals, the current year as enacted, and the budget year as requested — so FY2024 is a request in the PB2024 book, an enactment in PB2025 and an actual in PB2026. The three numbers differ, and the difference is the point: it is the only place in these sources where a request can be watched becoming an appropriation and then an outturn.
The same years, three ways
| Fiscal year | Requested | Enacted | Actual | Request → enacted |
|---|---|---|---|---|
| FY2018 | — | — | $240.4B | — |
| FY2019 | — | $244.9B | $244.8B | — |
| FY2020 | $247.3B | $252.5B | $250.3B | +2.1% |
| FY2021 | $243.4B | $251.5B | $250.0B | +3.3% |
| FY2022 | $245.6B | $266.6B | $275.0B | +8.5% |
| FY2023 | $276.0B | $307.7B | $323.1B | +11.5% |
| FY2024 | $315.0B | $303.5B | $354.1B | −3.7% |
| FY2025 | $310.7B | $315.7B | $329.9B | +1.6% |
| FY2026 | $384.3B | $434.2B | — | +13.0% |
| FY2027 | $756.8B | — | — | — |
Read across, not down. Each row is one fiscal year as three different books described it; they are three statements about the same money, not three amounts to add. A blank means no book we hold covers that year in that role.
PB2027 request by component
- Defense-Wide$291.6B470 budget lines
- Air Force and Space Force$233.3B772 budget lines
- Navy and Marine Corps$178.3B724 budget lines
- Army$91.0B759 budget lines
Each line's request in its own newest book, summed by the military department or defence agency whose account it sits in — derived from the account symbol, because the exhibits' own Organization column spells the same component four different ways across eight books. Lines last requested in an older book carry that older request, which is why this is a roster measure and not a fiscal-year total.
Checked against the Department's own total
The Program Acquisition Cost by Weapon System book states the same request these exhibits itemise, totalled by the Department itself. It is the one external check available on this extract, and it is asserted in the load transaction rather than in a test suite.
| Book | Measure | Department publishes | These exhibit lines total | Difference |
|---|---|---|---|---|
| PB2020 | Procurement (P-1) | $143.1B | $143.1B | ties |
| PB2020 | RDT&E (R-1) | $104.3B | $104.3B | ties |
| PB2021 | Procurement (P-1) | $136.9B | $136.9B | ties |
| PB2021 | RDT&E (R-1) | $106.6B | $106.6B | ties |
| PB2022 | Procurement (P-1) | $133.6B | $133.6B | ties |
| PB2022 | RDT&E (R-1) | $112.0B | $112.0B | ties |
| PB2023 | Procurement (P-1) | $145.9B | $145.9B | ties |
| PB2023 | RDT&E (R-1) | $130.1B | $130.1B | ties |
| PB2024 | Procurement (P-1) | $170.0B | $170.0B | ties |
| PB2024 | RDT&E (R-1) | $145.0B | $145.0B | ties |
| PB2025 | Procurement (P-1) | $167.5B | $167.5B | ties |
| PB2025 | RDT&E (R-1) | $143.2B | $143.2B | ties |
| PB2026 | Procurement (P-1) | $205.2B | $205.2B | ties |
| PB2026 | RDT&E (R-1) | $179.1B | $179.1B | ties |
Control EXH-08. A load whose exhibit lines do not total the published figure is rolled back, and the previous load stays current.
This check earned its place. The P-1 publishes an Advance Procurement (CY) row for a line and then restates the same money on the C (FY x for FY y) (M) rows beneath it. Counting both put the PB2026 procurement request at $219.6B against the $205.2B the Department publishes — a $14.4B double count that no internal consistency check would have seen, because the extract was perfectly consistent with itself.
The roster
Search, filter and sort run over every budget line in the roster rather than over the page on screen, and every view is a link. Ranked by default on the newest request rather than on lifetime dollars, so a line still being asked for outranks one that stopped being requested in 2021. Both are here.
| Budget line | Fund type | Service / agency | Appropriation · account | Category · weapons book | Category · J-book | Exhibit | Line item | Newest request | Years |
|---|---|---|---|---|---|---|---|---|---|
| National Security Space Launch Program (SPACE) - EMD | RDT&E | Air Force and Space ForceAF | Research, Development, Test, and Evaluation, Space Force3620F · 057-3620 | not in the book | — | R1 | 1206853SF | $2.7MPB2027 | FY2021–2027 |
| STUASL0 UAV | Procurement | Navy and Marine CorpsNAVY | Aircraft Procurement, Navy1506N · 017-1506 | not in the book | Other Aircraft | P1 | 0444 | $2.7MPB2023 | FY2018–2023 |
| National Space Defense Center | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 1203620F | $2.7MPB2021 | FY2018–2021 |
| Personnel Administration | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0901220F | $2.7MPB2027 | FY2018–2027 |
| Department of Defense Corrosion Program | RDT&E | Defense-WideOSD | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0604016D8Z | $2.7MPB2027 | FY2018–2027 |
| Cyberspace Operations Forces and Force Support | RDT&E | Defense-WideCYBER | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0305251JCY | $2.7MPB2024 | FY2024–2024 |
| Tactical Wheeled Vehicle Protection Kits | Procurement | ArmyARMY | Other Procurement, Army2035A · 021-2035 | not in the book | Tactical Vehicles | P1 | 8980D04003 | $2.7MPB2026 | FY2018–2026 |
| Dept of the Air Force Tech Architecture | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0604006F | $2.6MPB2024 | FY2022–2024 |
| Enduring Turbine Engines and Power Systems | RDT&E | ArmyA | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0607315A | $2.6MPB2025 | FY2024–2025 |
| Modifications Less Than $5.0m (WOCV-WTCV) | Procurement | ArmyARMY | Procurement of Weapons and Tracked Combat Vehicles, Army2033A · 021-2033 | not in the book | Mod of Weapons and Other Combat Veh | P1 | 9280GC0925 | $2.6MPB2021 | FY2018–2021 |
| Items Less Than $5 Million | Procurement | Navy and Marine CorpsNAVY | Other Procurement, Navy1810N · 017-1810 | not in the book | Other Ordnance Support Equipment | P1 | 5543 | $2.6MPB2027 | FY2018–2027 |
| MQ-1 Gray Eagle UAV | RDT&E | ArmyARMY | Research, Development, Test and Evaluation, Army2040A · 021-2040 | Aircraft & Related SystemsMQ-1C Gray Eagle | — | R1 | 0305219A | $2.6MPB2027 | FY2018–2027 |
| Real Property Analytics | RDT&E | Defense-WideOSD | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0305304D8Z | $2.6MPB2027 | FY2018–2027 |
| Global Combat Support System | RDT&E | ArmyARMY | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0303141A | $2.6MPB2025 | FY2018–2025 |
| Gray Eagle Mods2 | Procurement | ArmyARMY | Aircraft Procurement, Army2031A · 021-2031 | not in the book | Modification of Aircraft | P1 | 0756AA6601 | $2.6MPB2027 | FY2018–2027 |
| Counter Improvised Threat Technologies | Procurement | Defense-WideDTRA | Procurement, Defense-Wide0300D · 097-0300 | not in the book | Major Equipment, Defense Threat Reduction Agency | P1 | 40 | $2.5MPB2021 | FY2018–2021 |
| Calibration Sets Equipment | Procurement | ArmyARMY | Other Procurement, Army2035A · 021-2035 | not in the book | Test Measure and Dig Equipment (TMD) | P1 | 0100N10000 | $2.5MPB2021 | FY2018–2021 |
| Manned ISR | Procurement | Defense-WideSOCOM | Procurement, Defense-Wide0300D · 097-0300 | not in the book | Aviation Programs | P1 | 0201MANISR | $2.5MPB2025 | FY2018–2025 |
| Cyberspace Operations Forces and Force Support | RDT&E | Defense-WideDISA | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0305251K | $2.5MPB2023 | FY2023–2023 |
| Grnd Standoff Mine Detectn Sysm (GSTAMIDS) | Procurement | ArmyARMY | Other Procurement, Army2035A · 021-2035 | not in the book | Engineer (Non-Construction) Equipment | P1 | 2881R68400 | $2.5MPB2021 | FY2018–2024 |
| Defense Operations Security Initiative (DOSI) | RDT&E | Defense-WideOSD | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0203345D8Z | $2.5MPB2026 | FY2018–2026 |
| Defense Joint Counterintelligence Activities | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0305146F | $2.5MPB2027 | FY2018–2027 |
| Soldier Applied Research | RDT&E | ArmyARMY | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0602184A | $2.4MPB2027 | FY2022–2027 |
| Chemical Warfare Detectors | Procurement | Navy and Marine CorpsNAVY | Other Procurement, Navy1810N · 017-1810 | not in the book | Other Shipboard Equipment | P1 | 0989 | $2.4MPB2027 | FY2018–2027 |
| Joint Light Tactical Vehicle (JLTV) System Development & Demonstration | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | Ground SystemsJoint Light Tactical Vehicle | — | R1 | 0605813M | $2.4MPB2027 | FY2018–2027 |
| Global Video Surveillance Activities | Procurement | Defense-WideSOCOM | Procurement, Defense-Wide0300D · 097-0300 | not in the book | Other Procurement Programs | P1 | 0607GVAS | $2.4MPB2021 | FY2018–2021 |
| Mortar Fire Control System | Procurement | ArmyARMY | Other Procurement, Army2035A · 021-2035 | not in the book | Elect Equip - Tactical Surv. (Tac Surv) | P1 | 7500K99300 | $2.4MPB2027 | FY2018–2027 |
| Aegis Ashore Phase III | Procurement | Defense-WideMDA | Procurement, Defense-Wide0300D · 097-0300 | not in the book | Major Equipment, Missile Defense Agency | P1 | MD73 | $2.4MPB2024 | FY2018–2024 |
| Next Generation Load Device - Medium | RDT&E | ArmyARMY | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0605144A | $2.4MPB2027 | FY2022–2027 |
| Joint Regional Security Stacks (JRSS) | RDT&E | Defense-WideDISA | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0303228K | $2.4MPB2025 | FY2018–2025 |
| OPERATIONAL HQ - CYBER | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0208064F | $2.3MPB2023 | FY2020–2023 |
| NATO Research and Development | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0603790F | $2.3MPB2027 | FY2018–2027 |
| Unmanned ISR | RDT&E | Defense-WideSOCOM | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 1160434BB | $2.3MPB2026 | FY2018–2026 |
| Combat Survivor Evader Locator | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 1203176F | $2.3MPB2025 | FY2018–2025 |
| UAS MODS | Procurement | ArmyARMY | Aircraft Procurement, Army2031A · 021-2031 | not in the book | Modification of Aircraft | P1 | 9556A01002 | $2.3MPB2025 | FY2018–2025 |
| Command and Control Switchboard | Procurement | Navy and Marine CorpsNAVY | Other Procurement, Navy1810N · 017-1810 | not in the book | Other Shipboard Equipment | P1 | 0925 | $2.3MPB2027 | FY2018–2027 |
| Joint Tactical Network Center (JTNC) | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0605030F | $2.3MPB2024 | FY2018–2024 |
| Combat Survivor Evader Locater | Procurement | Air Force and Space ForceAF | Other Procurement, Air Force3080F · 057-3080 | not in the book | Organization and Base | P1 | 837170 | $2.2MPB2025 | FY2018–2025 |
| Air Force Calibration Programs | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0207521F | $2.2MPB2027 | FY2021–2027 |
| Insider Threat | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0305327N | $2.2MPB2027 | FY2019–2027 |
| Technology Transfer | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0604317F | $2.2MPB2027 | FY2018–2027 |
| LCS Module Weapons | Procurement | Navy and Marine CorpsNAVY | Weapons Procurement, Navy1507N · 017-1507 | not in the book | Modification of Guns and Gun Mounts | P1 | 4221 | $2.2MPB2027 | FY2018–2027 |
| Enterprise Information Technology Systems | RDT&E | Defense-WideDCAA | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0300206R | $2.2MPB2025 | FY2019–2025 |
| Cyber Security Initiative | RDT&E | Defense-WideMDA | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0305103C | $2.2MPB2027 | FY2018–2027 |
| Safety Program Management | RDT&E | Defense-WideMDA | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0202057C | $2.1MPB2027 | FY2022–2027 |
| Assault Bridge (Mod) | Procurement | ArmyARMY | Procurement of Weapons and Tracked Combat Vehicles, Army2033A · 021-2033 | not in the book | Modification of Tracked Combat Vehicles | P1 | 4520GZ3250 | $2.1MPB2022 | FY2018–2022 |
| Industrial Security Activities | RDT&E | Defense-WideDCSA | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0305133V | $2.1MPB2024 | FY2023–2024 |
| Materials Handling Vehicles | Procurement | Air Force and Space ForceAF | Other Procurement, Air Force3080F · 057-3080 | not in the book | Materials Handling Equipment | P1 | 825990 | $2.1MPB2027 | FY2018–2027 |
| First Destination Transportation | Procurement | Navy and Marine CorpsNAVY | Aircraft Procurement, Navy1506N · 017-1506 | not in the book | Aircraft Support Equip & Facilities | P1 | 0740 | $2.1MPB2021 | FY2018–2021 |
| Small Tactical Optical Rifle Mounted MLRF | Procurement | ArmyARMY | Other Procurement, Army2035A · 021-2035 | not in the book | Elect Equip - Tactical Surv. (Tac Surv) | P1 | 0155K35110 | $2.1MPB2026 | FY2018–2026 |
| BIOMETRIC TACTICAL COLLECTION DEVICES | Procurement | ArmyARMY | Other Procurement, Army2035A · 021-2035 | not in the book | Elect Equip - Tact Int Rel Act (TIARA) | P1 | 9988BK5300 | $2.1MPB2025 | FY2018–2025 |
| Mine and Expeditionary Warfare Advanced Technology | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0603782N | $2.1MPB2026 | FY2018–2026 |
| WWMCCS/Global Command and Control System | RDT&E | ArmyARMY | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0303150A | $2.1MPB2020 | FY2018–2020 |
| Biometrics Enabled Intelligence | RDT&E | ArmyARMY | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0307665A | $2.1MPB2022 | FY2018–2022 |
| SCALABLE CONTROL INTERFACE (SCI) | Procurement | ArmyA | Aircraft Procurement, Army2031A · 021-2031 | not in the book | Modification of Aircraft | P1 | 2724A12700 | $2.1MPB2027 | FY2026–2027 |
| National Technical Nuclear Forensics | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0207573F | $2.1MPB2025 | FY2018–2025 |
| Management Headquarters (Departmental Support Activities) | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0902498N | $2.1MPB2027 | FY2018–2027 |
| Missile/Air Defense Product Improvement Program | RDT&E | ArmyARMY | Research, Development, Test and Evaluation, Army2040A · 021-2040 | Missile Defense ProgramsPATRIOT/Lower-Tier Air and Missile Defense | — | R1 | 0203801A | $2.1MPB2027 | FY2018–2027 |
| Logistics Support Activities | RDT&E | Defense-WideDISA | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0708012K | $2.1MPB2027 | FY2019–2027 |
| Integrated Base Defense (Budget Activity 4) | RDT&E | ArmyARMY | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0604785A | $2.0MPB2022 | FY2020–2022 |
2,725 budget lines match. Amounts are the request in each line's newest book — an actual or an enactment is a different claim about a year and is not mixed in here. The two category columns come from different sources and are not interchangeable: one is the Department's own grouping of major systems, the other is the sub-activity the J-book files the line under.
How to read a figure on this page
A request is not an appropriation. The newest request column is what the Department asked for in its most recent book covering that line. Open the line to see what was enacted and what was actually reported.
The two category columns are different claims. One is the Department’s own grouping from the weapons book, and it is empty for most lines because that book itemises only major systems — an empty cell is a fact about the book, not about the line. The other is the budget sub-activity the J-book files the line under, which every procurement line has and no R-1 line does.
Memo lines are held out. The P-1R exhibit is National Guard and Reserve equipment already counted inside the P-1 lines, and some R-1 lines sit outside total obligation authority. They are kept and flagged rather than dropped — control EXH-03 asserts no total includes them.
One account, many lines. The exhibit account symbol resolves to a Treasury account, which is the join into execution — but several budget lines share one account and the execution files state no split between them. Nothing here apportions one.
Search does not guess. The query and the line are both stripped of case, spacing and punctuation, so f35 finds F-35. An abbreviation such as “JSF” works only because the weapons book itself writes the expansion, and the row says so. There is no similarity score anywhere.
Absence is absence in this cut. An empty result means the filter matched nothing in the vintage named above — never that the Department did not publish it.
Method and controls: EXH-01 through EXH-09, WBC-01 through WBC-03 · sources · where the chain breaks