Budget · the program roster
Every budget line in the President’s Budget
The P-1 and R-1 exhibits are the only source here keyed to a budget line rather than to a Treasury account, which makes them the spine everything else hangs from. Eight books are held, PB2020 through PB2027, and each one restates three fiscal years — so a single year appears three times with three different numbers, and all three are kept.
- Source
- DoD Comptroller President's Budget justification books, PB2020-PB2027
- Grain
- Budget line item x President's Budget year x fiscal year
- Vintage
- 2026-08-24
- Rows loaded
- 108,317
Path knowledge-bank/DOD-FM-Knowledge-Bank/11-Budget-Justification/_Archive · extracted 2026-09-19 04:53 · refresh annual, on publication of each President's Budget
Limitations The P-1R exhibit is National Guard and Reserve equipment already counted inside the P-1 lines, and R-1 rows marked Include-in-TOA = N sit outside total obligation authority; both are kept, flagged is_memo, and excluded from every total. Amounts are in thousands of dollars as published, are total obligation authority rather than outlays, and are not comparable to the execution files without ageing prior-year balances. The link from a weapons-book system to a budget line is derived from shared type designators or shared significant words -- neither source carries the other's key -- and every link records the evidence it rests on.
Amounts are total obligation authority as published, in thousands of dollars, converted here to dollars. They are not outlays and are not comparable to an execution figure without ageing prior-year balances.
What is held
Eight President's Budget books, three fiscal years each, at the grain the exhibits publish.
Why every year appears three times
A -1 exhibit is not a snapshot. Each book carries the prior year's actuals, the current year as enacted, and the budget year as requested — so FY2024 is a request in the PB2024 book, an enactment in PB2025 and an actual in PB2026. The three numbers differ, and the difference is the point: it is the only place in these sources where a request can be watched becoming an appropriation and then an outturn.
The same years, three ways
| Fiscal year | Requested | Enacted | Actual | Request → enacted |
|---|---|---|---|---|
| FY2018 | — | — | $240.4B | — |
| FY2019 | — | $244.9B | $244.8B | — |
| FY2020 | $247.3B | $252.5B | $250.3B | +2.1% |
| FY2021 | $243.4B | $251.5B | $250.0B | +3.3% |
| FY2022 | $245.6B | $266.6B | $275.0B | +8.5% |
| FY2023 | $276.0B | $307.7B | $323.1B | +11.5% |
| FY2024 | $315.0B | $303.5B | $354.1B | −3.7% |
| FY2025 | $310.7B | $315.7B | $329.9B | +1.6% |
| FY2026 | $384.3B | $434.2B | — | +13.0% |
| FY2027 | $756.8B | — | — | — |
Read across, not down. Each row is one fiscal year as three different books described it; they are three statements about the same money, not three amounts to add. A blank means no book we hold covers that year in that role.
PB2027 request by component
- Defense-Wide$291.6B470 budget lines
- Air Force and Space Force$233.3B772 budget lines
- Navy and Marine Corps$178.3B724 budget lines
- Army$91.0B759 budget lines
Each line's request in its own newest book, summed by the military department or defence agency whose account it sits in — derived from the account symbol, because the exhibits' own Organization column spells the same component four different ways across eight books. Lines last requested in an older book carry that older request, which is why this is a roster measure and not a fiscal-year total.
Checked against the Department's own total
The Program Acquisition Cost by Weapon System book states the same request these exhibits itemise, totalled by the Department itself. It is the one external check available on this extract, and it is asserted in the load transaction rather than in a test suite.
| Book | Measure | Department publishes | These exhibit lines total | Difference |
|---|---|---|---|---|
| PB2020 | Procurement (P-1) | $143.1B | $143.1B | ties |
| PB2020 | RDT&E (R-1) | $104.3B | $104.3B | ties |
| PB2021 | Procurement (P-1) | $136.9B | $136.9B | ties |
| PB2021 | RDT&E (R-1) | $106.6B | $106.6B | ties |
| PB2022 | Procurement (P-1) | $133.6B | $133.6B | ties |
| PB2022 | RDT&E (R-1) | $112.0B | $112.0B | ties |
| PB2023 | Procurement (P-1) | $145.9B | $145.9B | ties |
| PB2023 | RDT&E (R-1) | $130.1B | $130.1B | ties |
| PB2024 | Procurement (P-1) | $170.0B | $170.0B | ties |
| PB2024 | RDT&E (R-1) | $145.0B | $145.0B | ties |
| PB2025 | Procurement (P-1) | $167.5B | $167.5B | ties |
| PB2025 | RDT&E (R-1) | $143.2B | $143.2B | ties |
| PB2026 | Procurement (P-1) | $205.2B | $205.2B | ties |
| PB2026 | RDT&E (R-1) | $179.1B | $179.1B | ties |
Control EXH-08. A load whose exhibit lines do not total the published figure is rolled back, and the previous load stays current.
This check earned its place. The P-1 publishes an Advance Procurement (CY) row for a line and then restates the same money on the C (FY x for FY y) (M) rows beneath it. Counting both put the PB2026 procurement request at $219.6B against the $205.2B the Department publishes — a $14.4B double count that no internal consistency check would have seen, because the extract was perfectly consistent with itself.
The roster
Search, filter and sort run over every budget line in the roster rather than over the page on screen, and every view is a link. Ranked by default on the newest request rather than on lifetime dollars, so a line still being asked for outranks one that stopped being requested in 2021. Both are here.
| Budget line | Fund type | Service / agency | Appropriation · account | Category · weapons book | Category · J-book | Exhibit | Line item | Newest request | Years |
|---|---|---|---|---|---|---|---|---|---|
| F-22A | Procurement | Air Force and Space ForceAF | Aircraft Procurement, Air Force3010F · 057-3010 | Aircraft & Related SystemsF-22 Raptor | Tactical Aircraft | P1 | F02200 | $1.1BPB2027 | FY2018–2027 |
| Strategic Sub & Weapons System Support | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0101221N | $1.1BPB2027 | FY2018–2027 |
| F-15e | Procurement | Air Force and Space ForceAF | Aircraft Procurement, Air Force3010F · 057-3010 | Aircraft & Related SystemsF-15 Eagle | Tactical Forces | P1 | F015E0 | $1.1BPB2020 | FY2020–2021 |
| Advanced Battle Management System (ABMS) | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0604003F | $1.0BPB2027 | FY2019–2027 |
| Ground Moving Target Indicator (GMTI) | Procurement | Air Force and Space ForceF | Procurement, Space Force3022F · 057-3022 | not in the book | Space Procurement, SF | P1 | GMTI00 | $1.0BPB2027 | FY2026–2027 |
| DDG Mod | Procurement | Navy and Marine CorpsNAVY | Other Procurement, Navy1810N · 017-1810 | not in the book | Other Shipboard Equipment | P1 | 0900 | $1.0BPB2027 | FY2018–2027 |
| JOINT LIGHT TACTICAL VEHICLE | Procurement | ArmyARMY | Other Procurement, Army2035A · 021-2035 | Ground SystemsJoint Light Tactical Vehicle | Tactical Vehicles | P1 | 5600D15603 | $996.0MPB2020 | FY2018–2020 |
| CHALK CORAL | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0603734N | $995.7MPB2027 | FY2018–2027 |
| COUNTER SMALL UNMANNED AERIAL SYSTEM (C-SUAS) | Procurement | ArmyARMY | Other Procurement, Army2035A · 021-2035 | not in the book | Elect Equip - Tactical Surv. (Tac Surv) | P1 | 0219AD0500 | $994.1MPB2027 | FY2022–2027 |
| Technology Innovation | RDT&E | Defense-WideOSD | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0603375D8Z | $982.7MPB2027 | FY2018–2027 |
| Long Range Stand-Off Weapon | Procurement | Air Force and Space ForceAF | Missile Procurement, Air Force3020F · 057-3020 | Missiles & MunitionsLong Range Stand-Off Weapon | Strategic | P1 | MLRSO1 | $962.9MPB2027 | FY2023–2027 |
| Navy Next Generation Enterprise Network (NGEN) - Software Pilot program | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0608113N | $955.2MPB2022 | FY2022–2022 |
| F-22A Squadrons | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | Aircraft & Related SystemsF-22 Raptor | — | R1 | 0207138F | $950.4MPB2027 | FY2018–2027 |
| F-16 | Procurement | Air Force and Space ForceAF | Aircraft Procurement, Air Force3010F · 057-3010 | not in the book | Tactical Aircraftand 1 other budget activity | P1 | F01600 | $946.7MPB2027 | FY2018–2027 |
| Ballistic Missile Defense Command and Control, Battle Management and Communications (C2BMC) | RDT&E | Defense-WideMDA | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0603896C | $940.0MPB2027 | FY2018–2027 |
| AEGIS BMD | RDT&E | Defense-WideMDA | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0603892C | $927.9MPB2027 | FY2018–2027 |
| LRASM | Procurement | Navy and Marine CorpsNAVY | Weapons Procurement, Navy1507N · 017-1507 | not in the book | Tactical Missiles | P1 | 2291 | $906.8MPB2027 | FY2018–2027 |
| Network-Centric Warfare Technology | RDT&E | Defense-WideDARPA | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0603766E | $886.5MPB2025 | FY2018–2025 |
| TACTICAL NETWORK COMMUNICATION | Procurement | ArmyA | Other Procurement, Army2035A · 021-2035 | not in the book | Comm - Joint Communications | P1 | 1989B11200 | $866.3MPB2026 | FY2025–2026 |
| Ballistic Missile Defense Sensors | RDT&E | Defense-WideMDA | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0603884C | $865.4MPB2027 | FY2018–2027 |
| F-18 Series | Procurement | Navy and Marine CorpsNAVY | Aircraft Procurement, Navy1506N · 017-1506 | not in the book | Modification of Aircraft | P1 | 0525 | $858.7MPB2027 | FY2018–2027 |
| Narrowband Satellite Communications | RDT&E | Air Force and Space ForceAF | Research, Development, Test, and Evaluation, Space Force3620F · 057-3620 | not in the book | — | R1 | 1203109SF | $855.9MPB2027 | FY2022–2027 |
| THAAD | Procurement | Defense-WideMDA | Procurement, Defense-Wide0300D · 097-0300 | not in the book | Major Equipment, Missile Defense Agency | P1 | MD07 | $840.1MPB2026 | FY2018–2026 |
| Space Development Agency Launch | Procurement | Air Force and Space ForceAF | Procurement, Space Force3022F · 057-3022 | not in the book | Space Procurement, SF | P1 | SDALCH | $835.2MPB2027 | FY2023–2027 |
| Unmanned Aerial Systems Launched Effects Systems Development | RDT&E | ArmyA | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0605345A | $816.4MPB2027 | FY2026–2027 |
| Hypersonics Prototyping - Hypersonic Attack Cruise Missile (HACM) | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | Hypersonic WarfareHypersonic Attack Cruise Missile (HACM) | — | R1 | 0604183F | $806.1MPB2027 | FY2022–2027 |
| AMRAAM | Procurement | Navy and Marine CorpsNAVY | Weapons Procurement, Navy1507N · 017-1507 | not in the book | Tactical Missiles | P1 | 2206 | $804.3MPB2027 | FY2018–2027 |
| Patriot Mods | Procurement | ArmyARMY | Missile Procurement, Army2032A · 021-2032 | not in the book | Modifications | P1 | 0962C50700 | $796.8MPB2027 | FY2018–2027 |
| Spares and Repair Parts | Procurement | Navy and Marine CorpsNAVY | Other Procurement, Navy1810N · 017-1810 | not in the book | Spares and Repair Parts | P1 | 9020 | $765.7MPB2027 | FY2018–2027 |
| Radio Systems | Procurement | Navy and Marine CorpsNAVY | Procurement, Marine Corps1109N · 017-1109 | not in the book | Other Support (Non-Tel) | P1 | 4633 | $764.0MPB2027 | FY2018–2027 |
| Next-Gen OPIR -- Ground | RDT&E | Air Force and Space ForceAF | Research, Development, Test, and Evaluation, Space Force3620F · 057-3620 | not in the book | — | R1 | 1206440SF | $761.4MPB2027 | FY2022–2027 |
| Conventional Prompt Strike | Procurement | Navy and Marine CorpsN | Weapons Procurement, Navy1507N · 017-1507 | Hypersonic WarfareIntermediate Range Conventional Prompt Strike | Ballistic Missiles | P1 | 1160 | $750.4MPB2027 | FY2024–2027 |
| High Mobility Artillery Rocket System (HIMARS | Procurement | ArmyARMY | Missile Procurement, Army2032A · 021-2032 | not in the book | Anti-Tank/Assault Missile Sys | P1 | 6200C02901 | $745.7MPB2027 | FY2018–2027 |
| Outfitting | Procurement | Navy and Marine CorpsNAVY | Shipbuilding and Conversion, Navy1611N · 017-1611 | not in the book | Auxiliaries, Craft and Prior Yr Program Cost | P1 | 5110 | $741.3MPB2027 | FY2018–2027 |
| LRASM0 | Procurement | Air Force and Space ForceAF | Missile Procurement, Air Force3020F · 057-3020 | not in the book | Tactical | P1 | LRASM0 | $737.3MPB2027 | FY2018–2027 |
| Ship to Shore Connector | Procurement | Navy and Marine CorpsNAVY | Shipbuilding and Conversion, Navy1611N · 017-1611 | not in the book | Auxiliaries, Craft and Prior Yr Program Cost | P1 | 5112 | $733.9MPB2027 | FY2018–2027 |
| ICBM Reentry Vehicles | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0101328F | $733.2MPB2027 | FY2019–2027 |
| SMALL UNMANNED AERIAL SYSTEMS | Procurement | ArmyA | Aircraft Procurement, Army2031A · 021-2031 | not in the book | Agile Portfolio Management | P1 | 7000I47000 | $726.0MPB2026 | FY2026–2026 |
| Next-Gen OPIR -- Polar | RDT&E | Air Force and Space ForceAF | Research, Development, Test, and Evaluation, Space Force3620F · 057-3620 | not in the book | — | R1 | 1206444SF | $723.7MPB2026 | FY2022–2026 |
| Artillery Munitions | Procurement | Navy and Marine CorpsNAVY | Procurement of Ammunition, Navy and Marine Corps1508N · 017-1508 | not in the book | Marine Corps Ammunition | P1 | 1650 | $723.3MPB2027 | FY2018–2027 |
| Army Command Post Integrated Infrastructure ( | Procurement | ArmyARMY | Other Procurement, Army2035A · 021-2035 | not in the book | Elect Equip - Tactical C2 Systems | P1 | 9042B29810 | $723.2MPB2026 | FY2019–2026 |
| M-SHORAD - Procurement | Procurement | ArmyARMY | Missile Procurement, Army2032A · 021-2032 | not in the book | Surface-to-Air Missile System | P1 | 8082C14300 | $712.7MPB2027 | FY2020–2027 |
| PNT Resiliency, Mods, and Improvements | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0604201F | $710.8MPB2027 | FY2018–2027 |
| Tagos Surtass Ships | Procurement | Navy and Marine CorpsNAVY | Shipbuilding and Conversion, Navy1611N · 017-1611 | not in the book | Auxiliaries, Craft and Prior Yr Program Cost | P1 | 5030 | $710.7MPB2027 | FY2022–2027 |
| Artillery Systems - EMD | RDT&E | ArmyARMY | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0604854A | $709.2MPB2027 | FY2018–2027 |
| Shipboard IW Exploit | Procurement | Navy and Marine CorpsNAVY | Other Procurement, Navy1810N · 017-1810 | not in the book | Reconnaissance Equipment | P1 | 2360 | $701.7MPB2027 | FY2018–2027 |
| Networked Communications Capabilities | RDT&E | Defense-WideOSD | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0603662D8Z | $696.3MPB2027 | FY2018–2027 |
| COUNTER-SMALL UNMANNED AERIAL SYSTEM (C-SUAS) | Procurement | ArmyA | Other Procurement, Army2035A · 021-2035 | not in the book | Agile Portfolio Management | P1 | 0010I24000 | $693.4MPB2026 | FY2026–2026 |
| GPSIII Follow On | Procurement | Air Force and Space ForceAF | Procurement, Space Force3022F · 057-3022 | not in the book | Space Procurement, SF | P1 | GPS03C | $680.9MPB2027 | FY2021–2027 |
| Acquisition Integration and Interoperability (AI2) | RDT&E | Defense-WideOSD | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0605649D8Z | $668.6MPB2027 | FY2025–2027 |
| Ship Preliminary Design & Feasibility Studies | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0603564N | $666.6MPB2027 | FY2018–2027 |
| Common Ground Equipment | Procurement | Navy and Marine CorpsNAVY | Aircraft Procurement, Navy1506N · 017-1506 | not in the book | Aircraft Support Equip & Facilities | P1 | 0705 | $666.1MPB2027 | FY2018–2027 |
| RETRACT MAPLE | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0603746N | $655.6MPB2027 | FY2018–2027 |
| Abrams Upgrade Program | Procurement | ArmyARMY | Procurement of Weapons and Tracked Combat Vehicles, Army2033A · 021-2033 | not in the book | Modification of Tracked Combat Vehicles | P1 | 6500GA0750 | $655.0MPB2027 | FY2018–2027 |
| AIAMD Software Development & Integration | RDT&E | ArmyA | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0606118A | $653.7MPB2027 | FY2026–2027 |
| AN/SLQ-32 | Procurement | Navy and Marine CorpsNAVY | Other Procurement, Navy1810N · 017-1810 | not in the book | Electronic Warfare Equipment | P1 | 2312 | $653.5MPB2027 | FY2018–2027 |
| T-AH(X) | Procurement | Navy and Marine CorpsN | Shipbuilding and Conversion, Navy1611N · 017-1611 | not in the book | Auxiliaries, Craft and Prior Yr Program Cost | P1 | 5123 | $650.0MPB2027 | FY2027–2027 |
| Ballistic Missile Defense Terminal Defense Segment | RDT&E | Defense-WideMDA | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0603881C | $646.9MPB2026 | FY2018–2026 |
| V-22 (Tilt/Rotor ACFT) Osprey | Procurement | Navy and Marine CorpsNAVY | Aircraft Procurement, Navy1506N · 017-1506 | Aircraft & Related SystemsV-22 Osprey | Modification of Aircraft | P1 | 0590 | $641.7MPB2027 | FY2018–2027 |
| C-130J | Procurement | Air Force and Space ForceAF | Aircraft Procurement, Air Force3010F · 057-3010 | Aircraft & Related SystemsC-130J Hercules | Other Airlift | P1 | C130J0 | $636.7MPB2027 | FY2018–2027 |
2,725 budget lines match. Amounts are the request in each line's newest book — an actual or an enactment is a different claim about a year and is not mixed in here. The two category columns come from different sources and are not interchangeable: one is the Department's own grouping of major systems, the other is the sub-activity the J-book files the line under.
How to read a figure on this page
A request is not an appropriation. The newest request column is what the Department asked for in its most recent book covering that line. Open the line to see what was enacted and what was actually reported.
The two category columns are different claims. One is the Department’s own grouping from the weapons book, and it is empty for most lines because that book itemises only major systems — an empty cell is a fact about the book, not about the line. The other is the budget sub-activity the J-book files the line under, which every procurement line has and no R-1 line does.
Memo lines are held out. The P-1R exhibit is National Guard and Reserve equipment already counted inside the P-1 lines, and some R-1 lines sit outside total obligation authority. They are kept and flagged rather than dropped — control EXH-03 asserts no total includes them.
One account, many lines. The exhibit account symbol resolves to a Treasury account, which is the join into execution — but several budget lines share one account and the execution files state no split between them. Nothing here apportions one.
Search does not guess. The query and the line are both stripped of case, spacing and punctuation, so f35 finds F-35. An abbreviation such as “JSF” works only because the weapons book itself writes the expansion, and the row says so. There is no similarity score anywhere.
Absence is absence in this cut. An empty result means the filter matched nothing in the vintage named above — never that the Department did not publish it.
Method and controls: EXH-01 through EXH-09, WBC-01 through WBC-03 · sources · where the chain breaks