Budget · the program roster
Every budget line in the President’s Budget
The P-1 and R-1 exhibits are the only source here keyed to a budget line rather than to a Treasury account, which makes them the spine everything else hangs from. Eight books are held, PB2020 through PB2027, and each one restates three fiscal years — so a single year appears three times with three different numbers, and all three are kept.
- Source
- DoD Comptroller President's Budget justification books, PB2020-PB2027
- Grain
- Budget line item x President's Budget year x fiscal year
- Vintage
- 2026-08-24
- Rows loaded
- 108,317
Path knowledge-bank/DOD-FM-Knowledge-Bank/11-Budget-Justification/_Archive · extracted 2026-09-19 04:53 · refresh annual, on publication of each President's Budget
Limitations The P-1R exhibit is National Guard and Reserve equipment already counted inside the P-1 lines, and R-1 rows marked Include-in-TOA = N sit outside total obligation authority; both are kept, flagged is_memo, and excluded from every total. Amounts are in thousands of dollars as published, are total obligation authority rather than outlays, and are not comparable to the execution files without ageing prior-year balances. The link from a weapons-book system to a budget line is derived from shared type designators or shared significant words -- neither source carries the other's key -- and every link records the evidence it rests on.
Amounts are total obligation authority as published, in thousands of dollars, converted here to dollars. They are not outlays and are not comparable to an execution figure without ageing prior-year balances.
What is held
Eight President's Budget books, three fiscal years each, at the grain the exhibits publish.
Why every year appears three times
A -1 exhibit is not a snapshot. Each book carries the prior year's actuals, the current year as enacted, and the budget year as requested — so FY2024 is a request in the PB2024 book, an enactment in PB2025 and an actual in PB2026. The three numbers differ, and the difference is the point: it is the only place in these sources where a request can be watched becoming an appropriation and then an outturn.
The same years, three ways
| Fiscal year | Requested | Enacted | Actual | Request → enacted |
|---|---|---|---|---|
| FY2018 | — | — | $240.4B | — |
| FY2019 | — | $244.9B | $244.8B | — |
| FY2020 | $247.3B | $252.5B | $250.3B | +2.1% |
| FY2021 | $243.4B | $251.5B | $250.0B | +3.3% |
| FY2022 | $245.6B | $266.6B | $275.0B | +8.5% |
| FY2023 | $276.0B | $307.7B | $323.1B | +11.5% |
| FY2024 | $315.0B | $303.5B | $354.1B | −3.7% |
| FY2025 | $310.7B | $315.7B | $329.9B | +1.6% |
| FY2026 | $384.3B | $434.2B | — | +13.0% |
| FY2027 | $756.8B | — | — | — |
Read across, not down. Each row is one fiscal year as three different books described it; they are three statements about the same money, not three amounts to add. A blank means no book we hold covers that year in that role.
PB2027 request by component
- Defense-Wide$291.6B470 budget lines
- Air Force and Space Force$233.3B772 budget lines
- Navy and Marine Corps$178.3B724 budget lines
- Army$91.0B759 budget lines
Each line's request in its own newest book, summed by the military department or defence agency whose account it sits in — derived from the account symbol, because the exhibits' own Organization column spells the same component four different ways across eight books. Lines last requested in an older book carry that older request, which is why this is a roster measure and not a fiscal-year total.
Checked against the Department's own total
The Program Acquisition Cost by Weapon System book states the same request these exhibits itemise, totalled by the Department itself. It is the one external check available on this extract, and it is asserted in the load transaction rather than in a test suite.
| Book | Measure | Department publishes | These exhibit lines total | Difference |
|---|---|---|---|---|
| PB2020 | Procurement (P-1) | $143.1B | $143.1B | ties |
| PB2020 | RDT&E (R-1) | $104.3B | $104.3B | ties |
| PB2021 | Procurement (P-1) | $136.9B | $136.9B | ties |
| PB2021 | RDT&E (R-1) | $106.6B | $106.6B | ties |
| PB2022 | Procurement (P-1) | $133.6B | $133.6B | ties |
| PB2022 | RDT&E (R-1) | $112.0B | $112.0B | ties |
| PB2023 | Procurement (P-1) | $145.9B | $145.9B | ties |
| PB2023 | RDT&E (R-1) | $130.1B | $130.1B | ties |
| PB2024 | Procurement (P-1) | $170.0B | $170.0B | ties |
| PB2024 | RDT&E (R-1) | $145.0B | $145.0B | ties |
| PB2025 | Procurement (P-1) | $167.5B | $167.5B | ties |
| PB2025 | RDT&E (R-1) | $143.2B | $143.2B | ties |
| PB2026 | Procurement (P-1) | $205.2B | $205.2B | ties |
| PB2026 | RDT&E (R-1) | $179.1B | $179.1B | ties |
Control EXH-08. A load whose exhibit lines do not total the published figure is rolled back, and the previous load stays current.
This check earned its place. The P-1 publishes an Advance Procurement (CY) row for a line and then restates the same money on the C (FY x for FY y) (M) rows beneath it. Counting both put the PB2026 procurement request at $219.6B against the $205.2B the Department publishes — a $14.4B double count that no internal consistency check would have seen, because the extract was perfectly consistent with itself.
The roster
Search, filter and sort run over every budget line in the roster rather than over the page on screen, and every view is a link. Ranked by default on the newest request rather than on lifetime dollars, so a line still being asked for outranks one that stopped being requested in 2021. Both are here.
| Budget line | Fund type | Service / agency | Appropriation · account | Category · weapons book | Category · J-book | Exhibit | Line item | Newest request | Years |
|---|---|---|---|---|---|---|---|---|---|
| Tactical Technology | RDT&E | Defense-WideDARPA | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0602702E | $117.9MPB2025 | FY2018–2025 |
| Information Systems Security Program | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0303140F | $117.7MPB2027 | FY2018–2027 |
| Advanced EHF MILSATCOM (SPACE) | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 1206431F | $117.3MPB2020 | FY2018–2020 |
| Stand In Attack Weapon | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0207328F | $115.9MPB2027 | FY2018–2027 |
| Consolidated Training Systems Development | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0204571N | $115.8MPB2027 | FY2018–2027 |
| NAVSTAR Global Positioning System (Space and Control Segments) | RDT&E | Air Force and Space ForceAF | Research, Development, Test, and Evaluation, Space Force3620F · 057-3620 | not in the book | — | R1 | 1203165SF | $115.0MPB2027 | FY2021–2027 |
| Science & Technology for Nuclear Re-entry Systems | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0603273N | $114.8MPB2027 | FY2023–2027 |
| Submarine Acoustic Warfare Development | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0101226N | $114.3MPB2027 | FY2018–2027 |
| Joint Capability Technology Demonstrations | RDT&E | Defense-WideOSD | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0603648D8Z | $114.1MPB2023 | FY2018–2023 |
| NUDET Detection System (SPACE) | RDT&E | Air Force and Space ForceAF | Research, Development, Test, and Evaluation, Space Force3620F · 057-3620 | not in the book | — | R1 | 1203913SF | $114.0MPB2027 | FY2021–2027 |
| Major T&E Investment | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0604759N | $112.5MPB2027 | FY2018–2027 |
| Enterprise Ground Services | RDT&E | Air Force and Space ForceAF | Research, Development, Test, and Evaluation, Space Force3620F · 057-3620 | not in the book | — | R1 | 1206770SF | $111.3MPB2025 | FY2021–2025 |
| Gerald R. Ford Class Nuclear Aircraft Carrier (CVN 78 - 80) | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | Shipbuilding & Maritime SystemsCVN 78 Gerald R. Ford Class Nuclear Aircraft Carrier | — | R1 | 0604112N | $111.2MPB2027 | FY2018–2027 |
| Tactical Data Networks Enterprise | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0604281F | $110.2MPB2027 | FY2018–2027 |
| Access and Awareness | RDT&E | Defense-WideDARPA | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0602023E | $110.1MPB2027 | FY2026–2027 |
| Intelligence Systems Development | RDT&E | Defense-WideSOCOM | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 1160405BB | $109.2MPB2027 | FY2018–2027 |
| Rapid Resilient Command and Control (R2C2) | RDT&E | Air Force and Space ForceF | Research, Development, Test, and Evaluation, Space Force3620F · 057-3620 | not in the book | — | R1 | 1206772SF | $109.2MPB2027 | FY2026–2027 |
| Aviation Improvements | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0205633N | $108.5MPB2027 | FY2018–2027 |
| Mission Support | RDT&E | Defense-WideDARPA | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0605001E | $108.1MPB2027 | FY2018–2027 |
| 155mm Self-Propelled Howitzer Improvements | RDT&E | ArmyARMY | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0203743A | $107.8MPB2026 | FY2018–2026 |
| Unified Platform (UP) | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0208099F | $107.5MPB2023 | FY2019–2023 |
| Prompt Global Strike Capability Development | RDT&E | Defense-WideOSD | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0604165D8Z | $107.0MPB2020 | FY2018–2021 |
| Aircraft Survivability Development | RDT&E | ArmyARMY | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0605051A | $106.6MPB2027 | FY2018–2027 |
| Major T&E Investment | RDT&E | ArmyARMY | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0604759A | $106.1MPB2027 | FY2018–2027 |
| Protected Tactical Enterprise Service (PTES) | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 1206760F | $105.0MPB2020 | FY2018–2020 |
| Electromagnetic Spectrum Operations | RDT&E | Air Force and Space ForceF | Research, Development, Test, and Evaluation, Space Force3620F · 057-3620 | not in the book | — | R1 | 1207408SF | $105.0MPB2026 | FY2026–2026 |
| Army Space Systems Integration | RDT&E | ArmyARMY | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 1206308A | $105.0MPB2020 | FY2018–2020 |
| Offensive Anti-Surface Warfare Weapon Development | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0604786N | $104.5MPB2027 | FY2018–2027 |
| AF Foundational Development/Demos | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0603030F | $103.3MPB2021 | FY2021–2021 |
| Human Effectiveness Applied Research | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0602202F | $103.2MPB2027 | FY2018–2027 |
| Integrated Personnel and Pay System-Army (IPPS-A) | RDT&E | ArmyARMY | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0605018A | $102.7MPB2027 | FY2018–2027 |
| Persistent Knowledge, Awareness, & C2 Tech | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0603034F | $102.3MPB2021 | FY2021–2021 |
| Lightweight Torpedo Development | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0604610N | $102.2MPB2027 | FY2018–2027 |
| Space Security and Defense Program | RDT&E | Air Force and Space ForceAF | Research, Development, Test, and Evaluation, Space Force3620F · 057-3620 | not in the book | — | R1 | 1206730SF | $102.1MPB2027 | FY2021–2027 |
| Operational Test and Evaluation | RDT&E | Defense-WideOTE | Operational Test and Evaluation, Defense0460D · 097-0460 | not in the book | — | R1 | 0605118OTE | $101.4MPB2027 | FY2018–2027 |
| EO/IR Weather Systems | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 1203710F | $101.2MPB2020 | FY2018–2020 |
| Other Helo Development | RDT&E | Navy and Marine CorpsN | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0604212M | $101.2MPB2024 | FY2024–2024 |
| Strategic Mission Planning and Execution System - Software Pilot Program | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0608158F | $100.2MPB2023 | FY2022–2023 |
| Accelerate the Procurement and Fielding of Innovative Technologies (APFIT) | RDT&E | Defense-WideOSD | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0608775D8Z | $100.0MPB2023 | FY2023–2026 |
| Manufacturing Technology Program | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0603680F | $99.9MPB2027 | FY2018–2027 |
| Historically Black Colleges and Universities/Minority Institutions | RDT&E | Defense-WideOSD | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0601228D8Z | $99.7MPB2027 | FY2018–2027 |
| Electronic Warfare Systems Development | RDT&E | ArmyA | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0605275A | $99.7MPB2027 | FY2026–2027 |
| Multi-Domain Sensing System (MDSS) Adv Dev | RDT&E | ArmyARMY | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0604036A | $99.5MPB2027 | FY2022–2027 |
| Basic Operational Medical Research Science | RDT&E | Defense-WideDARPA | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0601117E | $99.0MPB2025 | FY2018–2025 |
| Tactical AIM Missiles | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0207161F | $98.9MPB2027 | FY2018–2027 |
| Tactical Electronic Surveillance System - Adv Dev | RDT&E | ArmyARMY | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0603766A | $98.3MPB2027 | FY2018–2027 |
| Airborne SIGINT Enterprise | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0304260F | $98.3MPB2027 | FY2018–2027 |
| Nuclear Weapons Support | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | —and 1 other budget activity | R1 | 0604222F | $97.0MPB2027 | FY2018–2027 |
| Armament/Ordnance Development | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0604602F | $96.8MPB2027 | FY2018–2027 |
| Air and Missile Defense Radar (AMDR) System | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | Missile Defense ProgramsPATRIOT/Lower-Tier Air and Missile Defense | — | R1 | 0604522N | $96.6MPB2027 | FY2018–2027 |
| Ballistic Missile Defense System Space Programs | RDT&E | Defense-WideMDA | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 1206895C | $95.8MPB2027 | FY2018–2027 |
| Directed Energy and Electric Weapon Systems | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0603925N | $94.8MPB2027 | FY2018–2027 |
| Space Situation Awareness Operations | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | —and 1 other budget activity | R1 | 1203940F | $94.7MPB2020 | FY2018–2020 |
| Defensive CYBER - Software Prototype Development | RDT&E | ArmyARMY | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0608041A | $94.1MPB2027 | FY2021–2027 |
| Joint Tactical Ground System | RDT&E | Air Force and Space ForceF | Research, Development, Test, and Evaluation, Space Force3620F · 057-3620 | not in the book | — | R1 | 1208053SF | $92.7MPB2027 | FY2024–2027 |
| Tactical Unmanned Ground Vehicle (TUGV) | RDT&E | ArmyARMY | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0604641A | $92.5MPB2025 | FY2023–2025 |
| Satellite Control Network (SPACE) | RDT&E | Air Force and Space ForceAF | Research, Development, Test, and Evaluation, Space Force3620F · 057-3620 | not in the book | — | R1 | 1203110SF | $92.5MPB2027 | FY2021–2027 |
| Key Management Infrastructure (KMI) | RDT&E | Defense-WideNSA | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0303136G | $92.0MPB2023 | FY2018–2023 |
| Directed Energy Technology | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0602605F | $91.8MPB2027 | FY2018–2027 |
| Nuclear Delivery Systems Prototyping | RDT&E | Air Force and Space ForceF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0604336F | $91.5MPB2027 | FY2025–2027 |
1,510 budget lines match. Amounts are the request in each line's newest book — an actual or an enactment is a different claim about a year and is not mixed in here. The two category columns come from different sources and are not interchangeable: one is the Department's own grouping of major systems, the other is the sub-activity the J-book files the line under.
How to read a figure on this page
A request is not an appropriation. The newest request column is what the Department asked for in its most recent book covering that line. Open the line to see what was enacted and what was actually reported.
The two category columns are different claims. One is the Department’s own grouping from the weapons book, and it is empty for most lines because that book itemises only major systems — an empty cell is a fact about the book, not about the line. The other is the budget sub-activity the J-book files the line under, which every procurement line has and no R-1 line does.
Memo lines are held out. The P-1R exhibit is National Guard and Reserve equipment already counted inside the P-1 lines, and some R-1 lines sit outside total obligation authority. They are kept and flagged rather than dropped — control EXH-03 asserts no total includes them.
One account, many lines. The exhibit account symbol resolves to a Treasury account, which is the join into execution — but several budget lines share one account and the execution files state no split between them. Nothing here apportions one.
Search does not guess. The query and the line are both stripped of case, spacing and punctuation, so f35 finds F-35. An abbreviation such as “JSF” works only because the weapons book itself writes the expansion, and the row says so. There is no similarity score anywhere.
Absence is absence in this cut. An empty result means the filter matched nothing in the vintage named above — never that the Department did not publish it.
Method and controls: EXH-01 through EXH-09, WBC-01 through WBC-03 · sources · where the chain breaks