datamatter
FY2027 requestJustificationWrite a J-book
Budget to executionFund distribution & timelineDistribution chain & lagFunds controlContractingBy programAssistance
Traceability breakLinkageReconciliationAudit postureFindings & NFRsSBR assuranceCongressional
Ask the corpusSourcesRaw dataDefinitionsControlsRegulatory search
Research

Budget · the program roster

Every budget line in the President’s Budget

The P-1 and R-1 exhibits are the only source here keyed to a budget line rather than to a Treasury account, which makes them the spine everything else hangs from. Eight books are held, PB2020 through PB2027, and each one restates three fiscal years — so a single year appears three times with three different numbers, and all three are kept.

Source
DoD Comptroller President's Budget justification books, PB2020-PB2027
Grain
Budget line item x President's Budget year x fiscal year
Vintage
2026-08-24
Rows loaded
108,317

Path knowledge-bank/DOD-FM-Knowledge-Bank/11-Budget-Justification/_Archive · extracted 2026-09-19 04:53 · refresh annual, on publication of each President's Budget

Limitations The P-1R exhibit is National Guard and Reserve equipment already counted inside the P-1 lines, and R-1 rows marked Include-in-TOA = N sit outside total obligation authority; both are kept, flagged is_memo, and excluded from every total. Amounts are in thousands of dollars as published, are total obligation authority rather than outlays, and are not comparable to the execution files without ageing prior-year balances. The link from a weapons-book system to a budget line is derived from shared type designators or shared significant words -- neither source carries the other's key -- and every link records the evidence it rests on.

Amounts are total obligation authority as published, in thousands of dollars, converted here to dollars. They are not outlays and are not comparable to an execution figure without ageing prior-year balances.

What is held

Eight President's Budget books, three fiscal years each, at the grain the exhibits publish.

Budget lines in the roster
20
matching the current filter
PB2027 request
$756.8B
1,655 line-items in the newest book
President's Budget books
8
PB2020 through PB2027
Fiscal years described
10
FY2018 through FY2027, each restated up to three times

Why every year appears three times

A -1 exhibit is not a snapshot. Each book carries the prior year's actuals, the current year as enacted, and the budget year as requested — so FY2024 is a request in the PB2024 book, an enactment in PB2025 and an actual in PB2026. The three numbers differ, and the difference is the point: it is the only place in these sources where a request can be watched becoming an appropriation and then an outturn.

The same years, three ways

Fiscal yearRequestedEnactedActualRequest → enacted
FY2018——$240.4B—
FY2019—$244.9B$244.8B—
FY2020$247.3B$252.5B$250.3B+2.1%
FY2021$243.4B$251.5B$250.0B+3.3%
FY2022$245.6B$266.6B$275.0B+8.5%
FY2023$276.0B$307.7B$323.1B+11.5%
FY2024$315.0B$303.5B$354.1B−3.7%
FY2025$310.7B$315.7B$329.9B+1.6%
FY2026$384.3B$434.2B—+13.0%
FY2027$756.8B———

Read across, not down. Each row is one fiscal year as three different books described it; they are three statements about the same money, not three amounts to add. A blank means no book we hold covers that year in that role.

PB2027 request by component

  • Defense-Wide$291.6B
    470 budget lines
  • Air Force and Space Force$233.3B
    772 budget lines
  • Navy and Marine Corps$178.3B
    724 budget lines
  • Army$91.0B
    759 budget lines

Each line's request in its own newest book, summed by the military department or defence agency whose account it sits in — derived from the account symbol, because the exhibits' own Organization column spells the same component four different ways across eight books. Lines last requested in an older book carry that older request, which is why this is a roster measure and not a fiscal-year total.

Checked against the Department's own total

The Program Acquisition Cost by Weapon System book states the same request these exhibits itemise, totalled by the Department itself. It is the one external check available on this extract, and it is asserted in the load transaction rather than in a test suite.

BookMeasureDepartment publishesThese exhibit lines totalDifference
PB2020Procurement (P-1)$143.1B$143.1Bties
PB2020RDT&E (R-1)$104.3B$104.3Bties
PB2021Procurement (P-1)$136.9B$136.9Bties
PB2021RDT&E (R-1)$106.6B$106.6Bties
PB2022Procurement (P-1)$133.6B$133.6Bties
PB2022RDT&E (R-1)$112.0B$112.0Bties
PB2023Procurement (P-1)$145.9B$145.9Bties
PB2023RDT&E (R-1)$130.1B$130.1Bties
PB2024Procurement (P-1)$170.0B$170.0Bties
PB2024RDT&E (R-1)$145.0B$145.0Bties
PB2025Procurement (P-1)$167.5B$167.5Bties
PB2025RDT&E (R-1)$143.2B$143.2Bties
PB2026Procurement (P-1)$205.2B$205.2Bties
PB2026RDT&E (R-1)$179.1B$179.1Bties

Control EXH-08. A load whose exhibit lines do not total the published figure is rolled back, and the previous load stays current.

This check earned its place. The P-1 publishes an Advance Procurement (CY) row for a line and then restates the same money on the C (FY x for FY y) (M) rows beneath it. Counting both put the PB2026 procurement request at $219.6B against the $205.2B the Department publishes — a $14.4B double count that no internal consistency check would have seen, because the extract was perfectly consistent with itself.

The roster

Search, filter and sort run over every budget line in the roster rather than over the page on screen, and every view is a link. Ranked by default on the newest request rather than on lifetime dollars, so a line still being asked for outranks one that stopped being requested in 2021. Both are here.

All exhibitsP-1 procurement · 1,223P-1R reserve and guard · memo only · 310R-1 research and development · 1,530In the weapons bookClear all
Budget line↕Fund type↕Service / agency↕Appropriation · account↕Category · weapons book↕Category · J-book↕Exhibit↕Line item↕Newest request↓Years↕
AH-64 Apache Block IIIA RemanProcurementArmyARMYAircraft Procurement, Army2031A · 021-2031Aircraft & Related SystemsAH-64E ApacheRotaryP1R5757A05111not requested in any book heldFY2020–2024
C-130ProcurementAir Force and Space ForceAFAircraft Procurement, Air Force3010F · 057-3010Aircraft & Related SystemsC-130J HerculesOther AircraftP1RC13000not requested in any book heldFY2018–2027
C-130 SeriesProcurementNavy and Marine CorpsNAVYAircraft Procurement, Navy1506N · 017-1506Aircraft & Related SystemsC-130J HerculesModification of AircraftP1R0560not requested in any book heldFY2018–2027
C-130JProcurementAir Force and Space ForceFAircraft Procurement, Air Force3010F · 057-3010Aircraft & Related SystemsC-130J HerculesOther AirliftP1RC130J0not requested in any book heldFY2023–2023
C-130J ModsProcurementAir Force and Space ForceFAircraft Procurement, Air Force3010F · 057-3010Aircraft & Related SystemsC-130J HerculesOther AircraftP1RC1300Jnot requested in any book heldFY2024–2025
C-40ProcurementAir Force and Space ForceAFAircraft Procurement, Air Force3010F · 057-3010Aircraft & Related SystemsC-40 Fleet ExpansionOther AircraftP1RC04000not requested in any book heldFY2018–2023
CH-47 Cargo Helicopter Mods (MYP)ProcurementArmyARMYAircraft Procurement, Army2031A · 021-2031Aircraft & Related SystemsCH-47 ChinookModification of AircraftP1R3264AA0252not requested in any book heldFY2019–2022
F-15ProcurementAir Force and Space ForceAFAircraft Procurement, Air Force3010F · 057-3010Aircraft & Related SystemsF-15 EagleTactical AircraftP1RF01500not requested in any book heldFY2018–2023
F-22AProcurementAir Force and Space ForceAFAircraft Procurement, Air Force3010F · 057-3010Aircraft & Related SystemsF-22 RaptorTactical AircraftP1RF02200not requested in any book heldFY2018–2027
Family Of Heavy Tactical Vehicles (FHTV)ProcurementArmyARMYOther Procurement, Army2035A · 021-2035Ground SystemsFamily of Heavy Tactical VehiclesTactical VehiclesP1R8309DA0500not requested in any book heldFY2018–2027
Family Of Medium Tactical Veh (FMTV)ProcurementArmyARMYOther Procurement, Army2035A · 021-2035Ground SystemsFamily of Medium Tactical Vehicles (FMTV)Tactical VehiclesP1R6866D15500not requested in any book heldFY2018–2027
JOINT LIGHT TACTICAL VEHICLEProcurementArmyARMYOther Procurement, Army2035A · 021-2035Ground SystemsJoint Light Tactical VehicleTactical VehiclesP1R5600D15603not requested in any book heldFY2020–2020
JOINT LIGHT TACTICAL VEHICLE FAMILY OF VEHICLProcurementArmyARMYOther Procurement, Army2035A · 021-2035Ground SystemsJoint Light Tactical VehicleTactical VehiclesP1R5731D15610not requested in any book heldFY2021–2025
Joint Direct Attack MunitionProcurementAir Force and Space ForceAFProcurement of Ammunition, Air Force3011F · 057-3011Missiles & MunitionsJoint Direct Attack Munition (JDAM)BombsP1R353620not requested in any book heldFY2018–2025
Joint Light Tactical VehicleProcurementAir Force and Space ForceAFOther Procurement, Air Force3080F · 057-3080Ground SystemsJoint Light Tactical VehicleSpecial Purpose VehiclesP1R823210not requested in any book heldFY2019–2027
MQ-1 UAVProcurementArmyAAircraft Procurement, Army2031A · 021-2031Aircraft & Related SystemsMQ-1C Gray EagleFixed WingP1R9670A00005not requested in any book heldFY2023–2026
Next Generation Squad WeaponProcurementArmyARMYProcurement of Weapons and Tracked Combat Vehicles, Army2033A · 021-2033Ground SystemsNext Generation Squad WeaponWeapons & Other Combat VehiclesP1R8205G14510not requested in any book heldFY2023–2027
Paladin Integrated Management (PIM)ProcurementArmyARMYProcurement of Weapons and Tracked Combat Vehicles, Army2033A · 021-2033Ground SystemsPaladin Integrated Management (PIM)Modification of Tracked Combat VehiclesP1R2073GZ0410not requested in any book heldFY2018–2026
UH-60 Black Hawk L and V ModelsProcurementArmyARMYAircraft Procurement, Army2031A · 021-2031Aircraft & Related SystemsUH-60 Black HawkRotaryP1R6773A05009not requested in any book heldFY2018–2024
UH-60 Blackhawk M Model (MYP)ProcurementArmyARMYAircraft Procurement, Army2031A · 021-2031Aircraft & Related SystemsUH-60 Black HawkRotaryP1R6771AA0005not requested in any book heldFY2018–2026

20 budget lines match. Amounts are the request in each line's newest book — an actual or an enactment is a different claim about a year and is not mixed in here. The two category columns come from different sources and are not interchangeable: one is the Department's own grouping of major systems, the other is the sub-activity the J-book files the line under.

How to read a figure on this page

A request is not an appropriation. The newest request column is what the Department asked for in its most recent book covering that line. Open the line to see what was enacted and what was actually reported.

The two category columns are different claims. One is the Department’s own grouping from the weapons book, and it is empty for most lines because that book itemises only major systems — an empty cell is a fact about the book, not about the line. The other is the budget sub-activity the J-book files the line under, which every procurement line has and no R-1 line does.

Memo lines are held out. The P-1R exhibit is National Guard and Reserve equipment already counted inside the P-1 lines, and some R-1 lines sit outside total obligation authority. They are kept and flagged rather than dropped — control EXH-03 asserts no total includes them.

One account, many lines. The exhibit account symbol resolves to a Treasury account, which is the join into execution — but several budget lines share one account and the execution files state no split between them. Nothing here apportions one.

Search does not guess. The query and the line are both stripped of case, spacing and punctuation, so f35 finds F-35. An abbreviation such as “JSF” works only because the weapons book itself writes the expansion, and the row says so. There is no similarity score anywhere.

Absence is absence in this cut. An empty result means the filter matched nothing in the vintage named above — never that the Department did not publish it.

Method and controls: EXH-01 through EXH-09, WBC-01 through WBC-03 · sources · where the chain breaks

Built on public USASpending data and a curated DoD financial-management knowledge bank. No controlled unclassified information is present on this site, and none transits it. Every figure names its source and vintage; see Sources and Controls.

© 2026 datamatter