Budget · the program roster
Every budget line in the President’s Budget
The P-1 and R-1 exhibits are the only source here keyed to a budget line rather than to a Treasury account, which makes them the spine everything else hangs from. Eight books are held, PB2020 through PB2027, and each one restates three fiscal years — so a single year appears three times with three different numbers, and all three are kept.
- Source
- DoD Comptroller President's Budget justification books, PB2020-PB2027
- Grain
- Budget line item x President's Budget year x fiscal year
- Vintage
- 2026-08-24
- Rows loaded
- 108,317
Path knowledge-bank/DOD-FM-Knowledge-Bank/11-Budget-Justification/_Archive · extracted 2026-09-19 04:53 · refresh annual, on publication of each President's Budget
Limitations The P-1R exhibit is National Guard and Reserve equipment already counted inside the P-1 lines, and R-1 rows marked Include-in-TOA = N sit outside total obligation authority; both are kept, flagged is_memo, and excluded from every total. Amounts are in thousands of dollars as published, are total obligation authority rather than outlays, and are not comparable to the execution files without ageing prior-year balances. The link from a weapons-book system to a budget line is derived from shared type designators or shared significant words -- neither source carries the other's key -- and every link records the evidence it rests on.
Amounts are total obligation authority as published, in thousands of dollars, converted here to dollars. They are not outlays and are not comparable to an execution figure without ageing prior-year balances.
What is held
Eight President's Budget books, three fiscal years each, at the grain the exhibits publish.
Why every year appears three times
A -1 exhibit is not a snapshot. Each book carries the prior year's actuals, the current year as enacted, and the budget year as requested — so FY2024 is a request in the PB2024 book, an enactment in PB2025 and an actual in PB2026. The three numbers differ, and the difference is the point: it is the only place in these sources where a request can be watched becoming an appropriation and then an outturn.
The same years, three ways
| Fiscal year | Requested | Enacted | Actual | Request → enacted |
|---|---|---|---|---|
| FY2018 | — | — | $240.4B | — |
| FY2019 | — | $244.9B | $244.8B | — |
| FY2020 | $247.3B | $252.5B | $250.3B | +2.1% |
| FY2021 | $243.4B | $251.5B | $250.0B | +3.3% |
| FY2022 | $245.6B | $266.6B | $275.0B | +8.5% |
| FY2023 | $276.0B | $307.7B | $323.1B | +11.5% |
| FY2024 | $315.0B | $303.5B | $354.1B | −3.7% |
| FY2025 | $310.7B | $315.7B | $329.9B | +1.6% |
| FY2026 | $384.3B | $434.2B | — | +13.0% |
| FY2027 | $756.8B | — | — | — |
Read across, not down. Each row is one fiscal year as three different books described it; they are three statements about the same money, not three amounts to add. A blank means no book we hold covers that year in that role.
PB2027 request by component
- Defense-Wide$291.6B470 budget lines
- Air Force and Space Force$233.3B772 budget lines
- Navy and Marine Corps$178.3B724 budget lines
- Army$91.0B759 budget lines
Each line's request in its own newest book, summed by the military department or defence agency whose account it sits in — derived from the account symbol, because the exhibits' own Organization column spells the same component four different ways across eight books. Lines last requested in an older book carry that older request, which is why this is a roster measure and not a fiscal-year total.
Checked against the Department's own total
The Program Acquisition Cost by Weapon System book states the same request these exhibits itemise, totalled by the Department itself. It is the one external check available on this extract, and it is asserted in the load transaction rather than in a test suite.
| Book | Measure | Department publishes | These exhibit lines total | Difference |
|---|---|---|---|---|
| PB2020 | Procurement (P-1) | $143.1B | $143.1B | ties |
| PB2020 | RDT&E (R-1) | $104.3B | $104.3B | ties |
| PB2021 | Procurement (P-1) | $136.9B | $136.9B | ties |
| PB2021 | RDT&E (R-1) | $106.6B | $106.6B | ties |
| PB2022 | Procurement (P-1) | $133.6B | $133.6B | ties |
| PB2022 | RDT&E (R-1) | $112.0B | $112.0B | ties |
| PB2023 | Procurement (P-1) | $145.9B | $145.9B | ties |
| PB2023 | RDT&E (R-1) | $130.1B | $130.1B | ties |
| PB2024 | Procurement (P-1) | $170.0B | $170.0B | ties |
| PB2024 | RDT&E (R-1) | $145.0B | $145.0B | ties |
| PB2025 | Procurement (P-1) | $167.5B | $167.5B | ties |
| PB2025 | RDT&E (R-1) | $143.2B | $143.2B | ties |
| PB2026 | Procurement (P-1) | $205.2B | $205.2B | ties |
| PB2026 | RDT&E (R-1) | $179.1B | $179.1B | ties |
Control EXH-08. A load whose exhibit lines do not total the published figure is rolled back, and the previous load stays current.
This check earned its place. The P-1 publishes an Advance Procurement (CY) row for a line and then restates the same money on the C (FY x for FY y) (M) rows beneath it. Counting both put the PB2026 procurement request at $219.6B against the $205.2B the Department publishes — a $14.4B double count that no internal consistency check would have seen, because the extract was perfectly consistent with itself.
The roster
Search, filter and sort run over every budget line in the roster rather than over the page on screen, and every view is a link. Ranked by default on the newest request rather than on lifetime dollars, so a line still being asked for outranks one that stopped being requested in 2021. Both are here.
| Budget line | Fund type | Service / agency | Appropriation · account | Category · weapons book | Category · J-book | Exhibit | Line item | Newest request | Years |
|---|---|---|---|---|---|---|---|---|---|
| Automate Sat C2 | RDT&E | Air Force and Space ForceF | Research, Development, Test, and Evaluation, Space Force3620F · 057-3620 | not in the book | — | R1 | 1207440SF | $1.5BPB2027 | FY2027–2027 |
| Proliferated Low Earth Orbit SATCOM | Procurement | Air Force and Space ForceF | Procurement, Space Force3022F · 057-3022 | not in the book | Space Procurement, SF | P1 | PLEO00 | $1.6BPB2027 | FY2027–2027 |
| DARPA Advanced Technology Development | RDT&E | Defense-WideDARPA | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0603467E | $1.6BPB2027 | FY2026–2027 |
| B-52 Squadrons | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0101113F | $1.6BPB2027 | FY2018–2027 |
| C2 TRANSPORT | Procurement | ArmyA | Other Procurement, Army2035A · 021-2035 | not in the book | Comm - Joint Communications | P1 | 1996B11500 | $1.6BPB2027 | FY2027–2027 |
| Making, Maintaining, Supply Chain and Logistics | RDT&E | Defense-WideDARPA | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0602025E | $1.6BPB2027 | FY2026–2027 |
| INDIRECT FIRE PROTECTION CAPABILITY INC 2-I | Procurement | ArmyARMY | Missile Procurement, Army2032A · 021-2032 | Missile Defense ProgramsIndirect Fire Protection Capability (IFPC) | Surface-to-Air Missile System | P1 | 8930C61001 | $1.6BPB2027 | FY2018–2027 |
| Rapid Prototyping Program | RDT&E | Defense-WideOSD | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0604331D8Z | $1.6BPB2027 | FY2018–2027 |
| TACAMO Modernization | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0605180N | $1.7BPB2027 | FY2022–2027 |
| Joint Advanced Tactical Missile | Procurement | Air Force and Space ForceF | Missile Procurement, Air Force3020F · 057-3020 | not in the book | Tactical | P1 | JATM00 | $1.7BPB2027 | FY2026–2027 |
| MSE Missile | Procurement | Navy and Marine CorpsN | Weapons Procurement, Navy1507N · 017-1507 | not in the book | Tactical Missiles | P1 | 2247 | $1.7BPB2027 | FY2026–2027 |
| Special Programs - MDA | RDT&E | Defense-WideMDA | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0603891C | $1.7BPB2027 | FY2018–2027 |
| Air Force Physical Security System | Procurement | Air Force and Space ForceAF | Other Procurement, Air Force3080F · 057-3080 | not in the book | Spcl Comm-Electronics Projects | P1 | 834130 | $1.8BPB2027 | FY2018–2027 |
| CONVENTIONAL PROMPT STRIKE (CPS) | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | Hypersonic WarfareIntermediate Range Conventional Prompt Strike | — | R1 | 0605518N | $1.8BPB2027 | FY2021–2027 |
| Test and Evaluation Support | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0605807F | $1.8BPB2027 | FY2018–2027 |
| Evolved Strategic SATCOM (ESS) | RDT&E | Air Force and Space ForceAF | Research, Development, Test, and Evaluation, Space Force3620F · 057-3620 | not in the book | —and 1 other budget activity | R1 | 1206855SF | $1.8BPB2027 | FY2021–2027 |
| Advanced Ship Building Industrial Base and Future Ship Experimental | RDT&E | Navy and Marine CorpsN | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0604545N | $1.9BPB2027 | FY2027–2027 |
| Medium Landing Ship | Procurement | Navy and Marine CorpsN | Shipbuilding and Conversion, Navy1611N · 017-1611 | Shipbuilding & Maritime SystemsMedium Landing Ship | Amphibious Ships | P1 | 3050 | $1.9BPB2027 | FY2025–2027 |
| PRECISION STRIKE MISSILE (PRSM) | Procurement | ArmyARMY | Missile Procurement, Army2032A · 021-2032 | not in the book | Surface-to-Air Missile System | P1 | 8540C29600 | $1.9BPB2027 | FY2021–2027 |
| Nuclear-Armed Sea-Launched Cruise Missile (SLCM-N) Support | RDT&E | Navy and Marine CorpsN | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0105519N | $1.9BPB2026 | FY2026–2026 |
| Joint Air-Surface Standoff Missile | Procurement | Air Force and Space ForceAF | Missile Procurement, Air Force3020F · 057-3020 | Missiles & MunitionsJoint Air-to-Surface Standoff Missile (JASSM) | Tactical | P1 | JASSM0 | $2.0BPB2027 | FY2018–2027 |
| Special Space Activities | Procurement | Air Force and Space ForceAF | Procurement, Space Force3022F · 057-3022 | not in the book | Space Procurement, SF | P1 | MSSPAC | $2.0BPB2027 | FY2021–2027 |
| Lower Tier Air and Missile Defense (AMD) Sen | Procurement | ArmyARMY | Missile Procurement, Army2032A · 021-2032 | Missile Defense ProgramsPATRIOT/Lower-Tier Air and Missile Defense | Surface-to-Air Missile System | P1 | 7265C12000 | $2.0BPB2027 | FY2022–2027 |
| AMRAAM | Procurement | Air Force and Space ForceAF | Missile Procurement, Air Force3020F · 057-3020 | not in the book | Tactical | P1 | MAMRA0 | $2.1BPB2027 | FY2018–2027 |
| F-35 C2D2 | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | Aircraft & Related SystemsF-35 Joint Strike Fighter | — | R1 | 0604840F | $2.1BPB2027 | FY2020–2027 |
| JSF STOVL | Procurement | Navy and Marine CorpsNAVY | Aircraft Procurement, Navy1506N · 017-1506 | not in the book | Combat Aircraft | P1 | 0152 | $2.1BPB2027 | FY2018–2027 |
| JADC2 Development and Experimentation Activities | RDT&E | Defense-WideOSD | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | —and 1 other budget activity | R1 | 0604122D8Z | $2.1BPB2027 | FY2024–2027 |
| Future Long Range Assault Aircraft Development | RDT&E | ArmyA | Research, Development, Test and Evaluation, Army2040A · 021-2040 | Aircraft & Related SystemsFuture Long-Range Assault Aircraft | — | R1 | 0605241A | $2.1BPB2027 | FY2025–2027 |
| Survivable Airborne Operations Center (SAOC) | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | —and 1 other budget activity | R1 | 0604288F | $2.2BPB2027 | FY2018–2027 |
| TAO Fleet Oiler | Procurement | Navy and Marine CorpsNAVY | Shipbuilding and Conversion, Navy1611N · 017-1611 | not in the book | Auxiliaries, Craft and Prior Yr Program Cost | P1 | 5025 | $2.2BPB2027 | FY2018–2027 |
| Industrial Facilities | Procurement | ArmyARMY | Procurement of Ammunition, Army2034A · 021-2034 | not in the book | Production Base Support | P1 | 0572EP1000 | $2.3BPB2027 | FY2018–2027 |
| Multi-Domain Joint Operations (MDJO) | RDT&E | Defense-WideOSD | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0604791D8Z | $2.4BPB2027 | FY2025–2027 |
| Other Production Charges | Procurement | Air Force and Space ForceAF | Aircraft Procurement, Air Force3010F · 057-3010 | not in the book | Other Production Charges | P1 | 000075 | $2.5BPB2027 | FY2018–2027 |
| LPD Flight II | Procurement | Navy and Marine CorpsNAVY | Shipbuilding and Conversion, Navy1611N · 017-1611 | not in the book | Amphibious Ships | P1 | 3010 | $2.5BPB2027 | FY2018–2027 |
| Ground Based Strategic Deterrent | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0605230F | $2.6BPB2022 | FY2018–2022 |
| Initial Spares/Repair Parts | Procurement | Air Force and Space ForceAF | Aircraft Procurement, Air Force3010F · 057-3010 | not in the book | Aircraft Spares and Repair Parts | P1 | 000999 | $2.6BPB2027 | FY2018–2027 |
| Completion of PY Shipbuilding Programs | Procurement | Navy and Marine CorpsNAVY | Shipbuilding and Conversion, Navy1611N · 017-1611 | not in the book | Auxiliaries, Craft and Prior Yr Program Cost | P1 | 5300 | $2.6BPB2027 | FY2020–2027 |
| Carrier Replacement Program | Procurement | Navy and Marine CorpsNAVY | Shipbuilding and Conversion, Navy1611N · 017-1611 | not in the book | Other Warships | P1 | 2001 | $2.6BPB2027 | FY2018–2027 |
| E-2D Adv Hawkeye | Procurement | Navy and Marine CorpsNAVY | Aircraft Procurement, Navy1506N · 017-1506 | Aircraft & Related SystemsE-2D Advance Hawkeye | Combat Aircraft | P1 | 0195 | $2.6BPB2027 | FY2018–2027 |
| Advanced Innovative Technologies | RDT&E | Defense-WideOSD | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0604250D8Z | $2.6BPB2027 | FY2018–2027 |
| MID-RANGE CAPABILITY (MRC) | Procurement | ArmyA | Missile Procurement, Army2032A · 021-2032 | not in the book | Surface-to-Air Missile System | P1 | 9214C81200 | $2.7BPB2027 | FY2024–2027 |
| Ship Maintenance, Repair and Modernization | Procurement | Navy and Marine CorpsNAVY | Other Procurement, Navy1810N · 017-1810 | not in the book | Reactor Plant Equipment | P1 | 1000 | $2.7BPB2027 | FY2020–2027 |
| Classified Programs | RDT&E | Navy and Marine Corps | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 9999999999 | $2.8BPB2027 | FY2018–2027 |
| KC-130J | Procurement | Navy and Marine CorpsNAVY | Aircraft Procurement, Navy1506N · 017-1506 | not in the book | Other Aircraft | P1 | 0416 | $2.8BPB2027 | FY2018–2027 |
| Long Range Strike - Bomber | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0604015F | $2.9BPB2027 | FY2018–2027 |
| F-15EX | Procurement | Air Force and Space ForceAF | Aircraft Procurement, Air Force3010F · 057-3010 | Aircraft & Related SystemsF-15 Eagle | Tactical Forcesand 2 other budget activities | P1 | F015EX | $2.9BPB2027 | FY2021–2027 |
| Golden Dome for America | RDT&E | Defense-WideOSD | Golden Dome for America Fund3007D · 097-3007 | not in the book | —and 1 other budget activity | R1 | 0901159D8Z | $2.9BPB2027 | FY2026–2027 |
| Tomahawk | Procurement | Navy and Marine CorpsNAVY | Weapons Procurement, Navy1507N · 017-1507 | not in the book | Strategic Missiles | P1 | 2101 | $3.0BPB2027 | FY2018–2027 |
| DDG-51 | Procurement | Navy and Marine CorpsNAVY | Shipbuilding and Conversion, Navy1611N · 017-1611 | Shipbuilding & Maritime SystemsDDG 51 Arleigh Burke Class Destroyer | Other Warships | P1 | 2122 | $3.3BPB2027 | FY2018–2027 |
| CH-53K (Heavy Lift) | Procurement | Navy and Marine CorpsNAVY | Aircraft Procurement, Navy1506N · 017-1506 | Aircraft & Related SystemsCH-53K Heavy Lift Helicopter | Combat Aircraft | P1 | 0158 | $3.5BPB2027 | FY2018–2027 |
| Resilient Missile Warning Missile Tracking - Low Earth Orbit (LEO) | RDT&E | Air Force and Space ForceAF | Research, Development, Test, and Evaluation, Space Force3620F · 057-3620 | Space Based SystemsMissile Warning / Missile Tracking (MW/MT) | — | R1 | 1206446SF | $3.6BPB2027 | FY2023–2027 |
| Classified Programs | Procurement | Defense-Wide | Procurement, Defense-Wide0300D · 097-0300 | not in the book | Classified Programs | P1 | 9999999999 | $3.6BPB2027 | FY2018–2027 |
| KC-46A MDAP | Procurement | Air Force and Space ForceAF | Aircraft Procurement, Air Force3010F · 057-3010 | Aircraft & Related SystemsKC-46A Tanker | Tactical Airliftand 1 other budget activity | P1 | KC046A | $3.6BPB2027 | FY2018–2027 |
| Test & Evaluation Science & Technology | RDT&E | Defense-WideOSD | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0603941D8Z | $3.8BPB2027 | FY2018–2027 |
| LHA Replacement | Procurement | Navy and Marine CorpsNAVY | Shipbuilding and Conversion, Navy1611N · 017-1611 | not in the book | Amphibious Ships | P1 | 3041 | $3.9BPB2027 | FY2018–2027 |
| Trident II Mods | Procurement | Navy and Marine CorpsNAVY | Weapons Procurement, Navy1507N · 017-1507 | not in the book | Modification of Missiles | P1 | 1250 | $3.9BPB2027 | FY2018–2027 |
| National Security Space Launch | Procurement | Air Force and Space ForceAF | Procurement, Space Force3022F · 057-3022 | not in the book | Space Procurement, SF | P1 | NSSL00 | $4.2BPB2027 | FY2021–2027 |
| Sovereign Artificial Intelligence (AI) Infrastructure | Procurement | Defense-WideDISA | Procurement, Defense-Wide0300D · 097-0300 | not in the book | Major Equipment, DISA | P1 | 21 | $4.2BPB2027 | FY2027–2027 |
| SM-3 IIAs | Procurement | Defense-WideMDA | Procurement, Defense-Wide0300D · 097-0300 | not in the book | Major Equipment, Missile Defense Agency | P1 | MD14 | $4.2BPB2027 | FY2020–2027 |
| P-8A Poseidon | Procurement | Navy and Marine CorpsNAVY | Aircraft Procurement, Navy1506N · 017-1506 | not in the book | Combat Aircraft | P1 | 0193 | $4.2BPB2027 | FY2018–2027 |
2,725 budget lines match. Amounts are the request in each line's newest book — an actual or an enactment is a different claim about a year and is not mixed in here. The two category columns come from different sources and are not interchangeable: one is the Department's own grouping of major systems, the other is the sub-activity the J-book files the line under.
How to read a figure on this page
A request is not an appropriation. The newest request column is what the Department asked for in its most recent book covering that line. Open the line to see what was enacted and what was actually reported.
The two category columns are different claims. One is the Department’s own grouping from the weapons book, and it is empty for most lines because that book itemises only major systems — an empty cell is a fact about the book, not about the line. The other is the budget sub-activity the J-book files the line under, which every procurement line has and no R-1 line does.
Memo lines are held out. The P-1R exhibit is National Guard and Reserve equipment already counted inside the P-1 lines, and some R-1 lines sit outside total obligation authority. They are kept and flagged rather than dropped — control EXH-03 asserts no total includes them.
One account, many lines. The exhibit account symbol resolves to a Treasury account, which is the join into execution — but several budget lines share one account and the execution files state no split between them. Nothing here apportions one.
Search does not guess. The query and the line are both stripped of case, spacing and punctuation, so f35 finds F-35. An abbreviation such as “JSF” works only because the weapons book itself writes the expansion, and the row says so. There is no similarity score anywhere.
Absence is absence in this cut. An empty result means the filter matched nothing in the vintage named above — never that the Department did not publish it.
Method and controls: EXH-01 through EXH-09, WBC-01 through WBC-03 · sources · where the chain breaks