Budget · the program roster
Every budget line in the President’s Budget
The P-1 and R-1 exhibits are the only source here keyed to a budget line rather than to a Treasury account, which makes them the spine everything else hangs from. Eight books are held, PB2020 through PB2027, and each one restates three fiscal years — so a single year appears three times with three different numbers, and all three are kept.
- Source
- DoD Comptroller President's Budget justification books, PB2020-PB2027
- Grain
- Budget line item x President's Budget year x fiscal year
- Vintage
- 2026-08-24
- Rows loaded
- 108,317
Path knowledge-bank/DOD-FM-Knowledge-Bank/11-Budget-Justification/_Archive · extracted 2026-09-19 04:53 · refresh annual, on publication of each President's Budget
Limitations The P-1R exhibit is National Guard and Reserve equipment already counted inside the P-1 lines, and R-1 rows marked Include-in-TOA = N sit outside total obligation authority; both are kept, flagged is_memo, and excluded from every total. Amounts are in thousands of dollars as published, are total obligation authority rather than outlays, and are not comparable to the execution files without ageing prior-year balances. The link from a weapons-book system to a budget line is derived from shared type designators or shared significant words -- neither source carries the other's key -- and every link records the evidence it rests on.
Amounts are total obligation authority as published, in thousands of dollars, converted here to dollars. They are not outlays and are not comparable to an execution figure without ageing prior-year balances.
What is held
Eight President's Budget books, three fiscal years each, at the grain the exhibits publish.
Why every year appears three times
A -1 exhibit is not a snapshot. Each book carries the prior year's actuals, the current year as enacted, and the budget year as requested — so FY2024 is a request in the PB2024 book, an enactment in PB2025 and an actual in PB2026. The three numbers differ, and the difference is the point: it is the only place in these sources where a request can be watched becoming an appropriation and then an outturn.
The same years, three ways
| Fiscal year | Requested | Enacted | Actual | Request → enacted |
|---|---|---|---|---|
| FY2018 | — | — | $240.4B | — |
| FY2019 | — | $244.9B | $244.8B | — |
| FY2020 | $247.3B | $252.5B | $250.3B | +2.1% |
| FY2021 | $243.4B | $251.5B | $250.0B | +3.3% |
| FY2022 | $245.6B | $266.6B | $275.0B | +8.5% |
| FY2023 | $276.0B | $307.7B | $323.1B | +11.5% |
| FY2024 | $315.0B | $303.5B | $354.1B | −3.7% |
| FY2025 | $310.7B | $315.7B | $329.9B | +1.6% |
| FY2026 | $384.3B | $434.2B | — | +13.0% |
| FY2027 | $756.8B | — | — | — |
Read across, not down. Each row is one fiscal year as three different books described it; they are three statements about the same money, not three amounts to add. A blank means no book we hold covers that year in that role.
PB2027 request by component
- Defense-Wide$291.6B470 budget lines
- Air Force and Space Force$233.3B772 budget lines
- Navy and Marine Corps$178.3B724 budget lines
- Army$91.0B759 budget lines
Each line's request in its own newest book, summed by the military department or defence agency whose account it sits in — derived from the account symbol, because the exhibits' own Organization column spells the same component four different ways across eight books. Lines last requested in an older book carry that older request, which is why this is a roster measure and not a fiscal-year total.
Checked against the Department's own total
The Program Acquisition Cost by Weapon System book states the same request these exhibits itemise, totalled by the Department itself. It is the one external check available on this extract, and it is asserted in the load transaction rather than in a test suite.
| Book | Measure | Department publishes | These exhibit lines total | Difference |
|---|---|---|---|---|
| PB2020 | Procurement (P-1) | $143.1B | $143.1B | ties |
| PB2020 | RDT&E (R-1) | $104.3B | $104.3B | ties |
| PB2021 | Procurement (P-1) | $136.9B | $136.9B | ties |
| PB2021 | RDT&E (R-1) | $106.6B | $106.6B | ties |
| PB2022 | Procurement (P-1) | $133.6B | $133.6B | ties |
| PB2022 | RDT&E (R-1) | $112.0B | $112.0B | ties |
| PB2023 | Procurement (P-1) | $145.9B | $145.9B | ties |
| PB2023 | RDT&E (R-1) | $130.1B | $130.1B | ties |
| PB2024 | Procurement (P-1) | $170.0B | $170.0B | ties |
| PB2024 | RDT&E (R-1) | $145.0B | $145.0B | ties |
| PB2025 | Procurement (P-1) | $167.5B | $167.5B | ties |
| PB2025 | RDT&E (R-1) | $143.2B | $143.2B | ties |
| PB2026 | Procurement (P-1) | $205.2B | $205.2B | ties |
| PB2026 | RDT&E (R-1) | $179.1B | $179.1B | ties |
Control EXH-08. A load whose exhibit lines do not total the published figure is rolled back, and the previous load stays current.
This check earned its place. The P-1 publishes an Advance Procurement (CY) row for a line and then restates the same money on the C (FY x for FY y) (M) rows beneath it. Counting both put the PB2026 procurement request at $219.6B against the $205.2B the Department publishes — a $14.4B double count that no internal consistency check would have seen, because the extract was perfectly consistent with itself.
The roster
Search, filter and sort run over every budget line in the roster rather than over the page on screen, and every view is a link. Ranked by default on the newest request rather than on lifetime dollars, so a line still being asked for outranks one that stopped being requested in 2021. Both are here.
| Budget line | Fund type | Service / agency | Appropriation · account | Category · weapons book | Category · J-book | Exhibit | Line item | Newest request | Years |
|---|---|---|---|---|---|---|---|---|---|
| Advanced Arresting Gear (AAG) | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0604530N | $60.5MPB2027 | FY2019–2027 |
| Support of Operational Testing | RDT&E | ArmyARMY | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0605712A | $60.7MPB2027 | FY2018–2027 |
| Strategic Environmental Research Program | RDT&E | Defense-WideOSD | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0603716D8Z | $60.8MPB2027 | FY2018–2027 |
| Fourth Estate Network Optimization (4ENO) | Procurement | Defense-WideDISA | Procurement, Defense-Wide0300D · 097-0300 | not in the book | Major Equipment, DISA | P1 | 98 | $60.8MPB2027 | FY2021–2027 |
| CSS Communications | Procurement | ArmyARMY | Other Procurement, Army2035A · 021-2035 | not in the book | Elect Equip - Automation | P1 | 3051BD3501 | $60.9MPB2025 | FY2020–2025 |
| Operational Energy and Installation Resilience | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0604860F | $61.0MPB2027 | FY2022–2027 |
| AIR & MSL Defense Planning & Control Sys | Procurement | ArmyARMY | Other Procurement, Army2035A · 021-2035 | not in the book | Elect Equip - Tactical C2 Systems | P1 | 9266AD5070 | $61.1MPB2027 | FY2018–2027 |
| Distributed Common Ground/Surface Systems | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0305208M | $61.2MPB2026 | FY2018–2026 |
| NC3 Commercial Development & Prototyping | RDT&E | Air Force and Space ForceF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0604005F | $61.4MPB2027 | FY2023–2027 |
| Precision Strike Package | Procurement | Defense-WideSOCOM | Procurement, Defense-Wide0300D · 097-0300 | not in the book | Aviation Programs | P1 | 1202PSP | $61.6MPB2026 | FY2018–2026 |
| COE Tactical Server Infrastructure (TSI) | Procurement | ArmyARMY | Other Procurement, Army2035A · 021-2035 | not in the book | Comm - C3 System | P1 | 8151B70000 | $61.8MPB2025 | FY2019–2025 |
| Satellite Control Network (SPACE) | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 1203110F | $61.9MPB2020 | FY2018–2020 |
| Air Traffic Control, Approach, and Landing System (ATCALS) | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0305114F | $61.9MPB2027 | FY2018–2027 |
| Aegis BMD Test | RDT&E | Defense-WideMDA | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0604878C | $62.0MPB2027 | FY2018–2027 |
| Other Production Charges | Procurement | Navy and Marine CorpsNAVY | Aircraft Procurement, Navy1506N · 017-1506 | not in the book | Aircraft Support Equip & Facilities | P1 | 0725 | $62.0MPB2027 | FY2018–2027 |
| International Intelligence Technology and Architectures | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0305600F | $62.0MPB2027 | FY2018–2027 |
| Space Control Technology | RDT&E | Air Force and Space ForceAF | Research, Development, Test, and Evaluation, Space Force3620F · 057-3620 | not in the book | — | R1 | 1206438SF | $62.0MPB2027 | FY2021–2027 |
| Army Technical Test Instrumentation and Targets | RDT&E | ArmyARMY | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0605602A | $62.3MPB2027 | FY2018–2027 |
| Weapons Industrial Facilities | Procurement | Navy and Marine CorpsNAVY | Weapons Procurement, Navy1507N · 017-1507 | not in the book | Support Equipment & Facilities | P1 | 2420 | $62.4MPB2027 | FY2018–2027 |
| Unmanned Undersea Vehicle Core Technologies | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0604029N | $62.5MPB2027 | FY2019–2027 |
| Afloat ATC Equipment | Procurement | Navy and Marine CorpsNAVY | Other Procurement, Navy1810N · 017-1810 | not in the book | Aviation Electronic Equipment | P1 | 2830 | $62.6MPB2027 | FY2018–2027 |
| C-17A | Procurement | Air Force and Space ForceAF | Aircraft Procurement, Air Force3010F · 057-3010 | not in the book | Airlift Aircraftand 1 other budget activity | P1 | C01700 | $62.9MPB2027 | FY2018–2027 |
| Drones And Decoys | Procurement | Navy and Marine CorpsNAVY | Weapons Procurement, Navy1507N · 017-1507 | not in the book | Tactical Missiles | P1 | 2285 | $62.9MPB2023 | FY2020–2023 |
| Anti-Armor Missile-Javelin | Procurement | Navy and Marine CorpsNAVY | Procurement, Marine Corps1109N · 017-1109 | not in the book | Guided Missiles | P1 | 3011 | $63.0MPB2027 | FY2018–2027 |
| Cartridges & Cart Actuated Devices | Procurement | Navy and Marine CorpsNAVY | Procurement of Ammunition, Navy and Marine Corps1508N · 017-1508 | not in the book | Navy Ammunition | P1 | 0180 | $63.1MPB2027 | FY2018–2027 |
| University Research Initiatives | RDT&E | ArmyARMY | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0601103A | $63.1MPB2027 | FY2018–2027 |
| SITUATION INFORMATION TRANSPORT | Procurement | ArmyARMY | Other Procurement, Army2035A · 021-2035 | not in the book | Comm - Joint Communications | P1 | 1983BW7200 | $63.4MPB2021 | FY2019–2021 |
| Cross Functional Team (CFT) Advanced Development & Prototyping | RDT&E | ArmyARMY | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0604020A | $63.8MPB2025 | FY2019–2026 |
| Air and Missile Defense Advanced Technology | RDT&E | ArmyARMY | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0603466A | $63.9MPB2027 | FY2020–2027 |
| Electronic Warfare Basic Research | RDT&E | ArmyA | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0601275A | $64.0MPB2027 | FY2026–2027 |
| Space Control Technology | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 1206438F | $64.2MPB2020 | FY2018–2020 |
| Space Superiority ISR | RDT&E | Air Force and Space ForceAF | Research, Development, Test, and Evaluation, Space Force3620F · 057-3620 | not in the book | — | R1 | 1203330SF | $64.3MPB2027 | FY2021–2027 |
| Small Diameter Bomb (SDB) | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0604329N | $64.4MPB2027 | FY2018–2027 |
| Ocean Warfighting Environment Applied Research | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0602435N | $64.7MPB2027 | FY2018–2027 |
| C2 Infrastructure | RDT&E | ArmyA | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0605333A | $64.8MPB2027 | FY2027–2027 |
| Spacelift Range System Space | Procurement | Air Force and Space ForceAF | Procurement, Space Force3022F · 057-3022 | not in the book | Space Procurement, SF | P1 | SPRNGE | $64.9MPB2027 | FY2021–2027 |
| M10 BOOKER | Procurement | ArmyARMY | Procurement of Weapons and Tracked Combat Vehicles, Army2033A · 021-2033 | Ground SystemsM10 Booker (formerly Mobile Protected Firepower) | Tracked Combat Vehicles | P1 | 7181G80820 | $64.9MPB2026 | FY2022–2026 |
| CBRN Defense | Procurement | ArmyARMY | Other Procurement, Army2035A · 021-2035 | not in the book | Chemical Defensive Equipment | P1 | 4516M01001 | $65.0MPB2027 | FY2018–2027 |
| LCS MCM Mission Modules | Procurement | Navy and Marine CorpsNAVY | Other Procurement, Navy1810N · 017-1810 | not in the book | Other Ship Support | P1 | 1601 | $65.1MPB2027 | FY2018–2027 |
| Logistics and Engineer Equipment - Eng Dev | RDT&E | ArmyARMY | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0604804A | $65.2MPB2027 | FY2018–2027 |
| Looking Glass Next | RDT&E | Air Force and Space ForceF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0302060F | $65.3MPB2027 | FY2027–2027 |
| Army Evaluation Center | RDT&E | ArmyARMY | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0605716A | $65.6MPB2027 | FY2018–2027 |
| Repair and Test Equipment | Procurement | Navy and Marine CorpsNAVY | Procurement, Marine Corps1109N · 017-1109 | not in the book | Repair and Test Equipment | P1 | 4181 | $65.7MPB2027 | FY2018–2027 |
| Major T&E Investment - Space | RDT&E | Air Force and Space ForceAF | Research, Development, Test, and Evaluation, Space Force3620F · 057-3620 | not in the book | — | R1 | 1206759SF | $65.7MPB2027 | FY2022–2027 |
| SSBN Security Technology Program | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0101224N | $65.9MPB2027 | FY2018–2027 |
| Ground/Air Task Oriented Radar (G/ATOR) | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0204460M | $66.3MPB2027 | FY2018–2027 |
| Navy Warfighting Experiments and Demonstrations | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0603758N | $66.4MPB2027 | FY2018–2027 |
| H-1 Upgrades | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0604245M | $66.4MPB2027 | FY2019–2027 |
| Compass Call | RDT&E | Air Force and Space ForceAF | Research, Development, Test and Evaluation, Air Force3600F · 057-3600 | not in the book | — | R1 | 0207253F | $66.5MPB2027 | FY2018–2027 |
| DDG 1000 | Procurement | Navy and Marine CorpsNAVY | Shipbuilding and Conversion, Navy1611N · 017-1611 | not in the book | Other Warships | P1 | 2119 | $66.5MPB2027 | FY2018–2027 |
| Large Aircraft Infrared Countermeasures | Procurement | Air Force and Space ForceAF | Aircraft Procurement, Air Force3010F · 057-3010 | not in the book | Strategic Aircraft | P1 | LAIRCM | $66.6MPB2027 | FY2018–2027 |
| Grenades, All Types | Procurement | ArmyARMY | Procurement of Ammunition, Army2034A · 021-2034 | not in the book | Other Ammunition | P1 | 4582E34000 | $66.8MPB2027 | FY2018–2027 |
| Joint Staff Office of the Chief Data Officer (OCDO) Activities | RDT&E | Defense-WideTJS | Research, Development, Test and Evaluation, Defense-Wide0400D · 097-0400 | not in the book | — | R1 | 0305248J | $67.0MPB2027 | FY2025–2027 |
| Improved Turbine Engine Program | RDT&E | ArmyARMY | Research, Development, Test and Evaluation, Army2040A · 021-2040 | not in the book | — | R1 | 0607139A | $67.0MPB2025 | FY2018–2026 |
| Coast Guard Equipment | Procurement | Navy and Marine CorpsNAVY | Other Procurement, Navy1810N · 017-1810 | not in the book | Other Electronic Support | P1 | 3620 | $67.1MPB2027 | FY2018–2027 |
| MK-48 Torpedo ADCAP Mods | Procurement | Navy and Marine CorpsNAVY | Weapons Procurement, Navy1507N · 017-1507 | not in the book | Mod of Torpedoes and Related Equip | P1 | 3225 | $67.3MPB2027 | FY2018–2027 |
| University Research Initiatives | RDT&E | Navy and Marine CorpsNAVY | Research, Development, Test and Evaluation, Navy1319N · 017-1319 | not in the book | — | R1 | 0601103N | $67.3MPB2026 | FY2018–2026 |
| E-11 BACN/HAG | Procurement | Air Force and Space ForceAF | Aircraft Procurement, Air Force3010F · 057-3010 | not in the book | Other Aircraft | P1 | E011A1 | $67.4MPB2024 | FY2021–2024 |
| 60MM Mortar, All Types | Procurement | ArmyARMY | Procurement of Ammunition, Army2034A · 021-2034 | not in the book | Mortar Ammunition | P1 | 0050E89600 | $67.7MPB2027 | FY2018–2027 |
| Supply Equipment | Procurement | Navy and Marine CorpsNAVY | Other Procurement, Navy1810N · 017-1810 | not in the book | Supply Support Equipment | P1 | 7025 | $67.8MPB2027 | FY2018–2027 |
2,725 budget lines match. Amounts are the request in each line's newest book — an actual or an enactment is a different claim about a year and is not mixed in here. The two category columns come from different sources and are not interchangeable: one is the Department's own grouping of major systems, the other is the sub-activity the J-book files the line under.
How to read a figure on this page
A request is not an appropriation. The newest request column is what the Department asked for in its most recent book covering that line. Open the line to see what was enacted and what was actually reported.
The two category columns are different claims. One is the Department’s own grouping from the weapons book, and it is empty for most lines because that book itemises only major systems — an empty cell is a fact about the book, not about the line. The other is the budget sub-activity the J-book files the line under, which every procurement line has and no R-1 line does.
Memo lines are held out. The P-1R exhibit is National Guard and Reserve equipment already counted inside the P-1 lines, and some R-1 lines sit outside total obligation authority. They are kept and flagged rather than dropped — control EXH-03 asserts no total includes them.
One account, many lines. The exhibit account symbol resolves to a Treasury account, which is the join into execution — but several budget lines share one account and the execution files state no split between them. Nothing here apportions one.
Search does not guess. The query and the line are both stripped of case, spacing and punctuation, so f35 finds F-35. An abbreviation such as “JSF” works only because the weapons book itself writes the expansion, and the row says so. There is no similarity score anywhere.
Absence is absence in this cut. An empty result means the filter matched nothing in the vintage named above — never that the Department did not publish it.
Method and controls: EXH-01 through EXH-09, WBC-01 through WBC-03 · sources · where the chain breaks