Budget line · P1R · Procurement, Marine Corps

Radio Systems

Line item 4633 in account 1109N (Treasury account 017-1109). Held in 6 President's Budget books, describing fiscal years 2021 through 2027.

Source
DoD Comptroller President's Budget justification books, PB2020-PB2027
Grain
Budget line item x President's Budget year x fiscal year
Vintage
2026-08-24
Rows loaded
108,317

Path knowledge-bank/DOD-FM-Knowledge-Bank/11-Budget-Justification/_Archive · extracted 2026-09-19 04:53 · refresh annual, on publication of each President's Budget

Limitations The P-1R exhibit is National Guard and Reserve equipment already counted inside the P-1 lines, and R-1 rows marked Include-in-TOA = N sit outside total obligation authority; both are kept, flagged is_memo, and excluded from every total. Amounts are in thousands of dollars as published, are total obligation authority rather than outlays, and are not comparable to the execution files without ageing prior-year balances. The link from a weapons-book system to a budget line is derived from shared type designators or shared significant words -- neither source carries the other's key -- and every link records the evidence it rests on.

Amounts are total obligation authority as published in the exhibit, in thousands of dollars, converted here to dollars.

← the rosterMemo line — restates money counted elsewhere

This is a memo line. It restates money that is already counted on another line in the same book — reserve or National Guard equipment, a cost-type breakout, or an item outside total obligation authority. It is shown because dropping it would make its absence from the totals unexplainable, and it is excluded from every total on this site (control EXH-03).

What was asked for, what was appropriated, what was reported

Each President's Budget book restates three fiscal years: the prior year as actuals, the current year as enacted, and the budget year as requested. So this line appears in three successive books for the same fiscal year, and the three numbers differ. That difference is the restatement history, and it exists nowhere else in these sources.

FY2027 requested
$100,000
from the PB2027 book
Enacted for that year
—
no book we hold states FY2027 as enacted yet
Reported as actual
—
no book we hold states FY2027 as an actual yet
Request to enactment
—
Congress against the FY2027 request
Fiscal yearRequestedEnactedActualRequest → enactedEnacted → actualQuantity
FY2021$34.4M · PB2021$34.4M · PB2022$34.4M · PB2023+0.0%+0.0%—
FY2025$94,000 · PB2025$94,000 · PB2026$94,000 · PB2027+0.0%+0.0%—
FY2026$92,000 · PB2026$92,000 · PB2027—+0.0%——
FY2027$100,000 · PB2027—————

Read across, not down: one fiscal year as up to three books described it. The book year is shown beside each figure because the same number means different things depending on which book it came from.

Enacted as a share of what was requested

0%57%115%Appropriated as requestedFY21FY25FY26

Hover the line for a fiscal year.

The reference line is the request. Above it, Congress appropriated more than was asked for; below it, less. Neither is a finding on its own — a multiyear procurement, a rescission and a programme restructure all look like this from here.

Requested, by fiscal year

$0$19.8M$39.6MFY21FY25FY26FY27

Hover the line for a fiscal year.

Each point is the request in the book that made it, not a restated figure. A line that disappears was not requested in a later book we hold.

What makes up the FY2027 figure

The exhibit rows behind the number above, as published in the PB2027 book. Procurement lines are split by cost type — weapon system cost, advance procurement, subsequent full funding — and those parts are what the line's total is made of.

Cost typeAmountQuantityColumn readCounted
Reserve Equip (MEMO NON ADD)$100,000—FY 2027 Total Amountmemo — held out

The fiscal-year figure was taken from the exhibit’s own total column for that year. Which rule applied is recorded per row and asserted by control EXH-05, because the exhibits change shape between eras and the broadest figure for a year is not always in the same column.

The rows marked memo — held out restate money already counted on the rows above them. The P-1 publishes an Advance Procurement (CY) subtotal and then the same money again as C (FY x for FY y) (M) detail; counting both double-counts the line. Control EXH-08 catches exactly this by tying the department-wide total to the figure the Department publishes.

Into execution: the Treasury account this line is appropriated to

The exhibit account symbol and the Treasury account symbol differ only by the organisation letter, and that crosswalk is the whole bridge from a budget line into the execution files. What it reaches is an ACCOUNT, not a line item.

Fiscal yearBudgetary resources (D+R)Obligations (D+R)Direct (File B)Reimbursable (File B)Direct rateUnobligatedGross outlays
FY2021$3.5B$2.8B$2.8B$7.8M80.9%$665.5M$2.6B
FY2022$4.5B$3.4B$3.4B$10.8M75.9%$1.1B$2.4B
FY2023$5.8B$4.6B$4.6B$078.2%$1.3B$2.9B
FY2024$5.8B$3.7B$3.7B$10.7M63.8%$2.1B$3.7B
FY2025$6.1B$4.6B$4.6B$074.5%$1.6B$3.4B
FY2026 *$5.6B$3.2B$3.2B$058.8%$2.4B$3.2B

File A, Procurement, Marine Corps. These are the whole account's figures — several budget lines share this account and File A states no split between them, so this is the ceiling this line was funded within, not this line's own execution.

This is the step where line-item precision is lost, and it is lost in the sources rather than here: File A is keyed to accounts and carries no budget line at all. An account obligation cannot be attributed to one of the budget lines inside it, and nothing on this page attempts to. A year marked * is period-to-date.

Into contracts

Two routes reach the contract file from here, and they answer different questions. The acquisition program code follows this system; the account set follows the appropriation.

By account named on the contract action, FY2026 — the newest year the contract file reaches, against a FY2027 budget year

No contract action in the FY2026 cut of the acquisition programs this site carries named 017-1109 among its funding accounts. The contract file is cut by acquisition program here, and roughly three quarters of DoD contract dollars carry no program code at all — so this is a narrow window, not a complete answer.

How to read a figure on this page

Three numbers, one year. A fiscal year’s request, enactment and actual come from three different books and are three different claims. They are never averaged, reconciled away or shown as one figure here.

The chain narrows, then breaks. Budget line → Treasury account is exact. Account → execution is exact but no longer line-specific. Account → contract is a window onto the quarter of the contract file that carries a program code. The traceability page is about that break.

Quantity is what was bought, not what was funded. Advance procurement and subsequent full funding move money between years without moving units, which is why a quantity can stay flat while an amount moves by multiples.

Absence is absence in this cut. A blank cell means no book or file we hold covers that combination in the vintage named above — never that the Department did not report it.

Method and controls: EXH-01 through EXH-09 · sources · back to the roster

Built on public USASpending data and a curated DoD financial-management knowledge bank. No controlled unclassified information is present on this site, and none transits it. Every figure names its source and vintage; see Sources and Controls.

© 2026 datamatter