datamatter
FY2027 requestJustificationWrite a J-book
Budget to executionFund distribution & timelineDistribution chain & lagFunds controlContractingBy programAssistance
Traceability breakLinkageReconciliationAudit postureFindings & NFRsSBR assuranceCongressional
Ask the corpusSourcesRaw dataDefinitionsControlsRegulatory search
Research

Budget line · P1 · Weapons Procurement, Navy

SSTD

Line item 3113 in account 1507N (Treasury account 017-1507). Held in 8 President's Budget books, describing fiscal years 2018 through 2027.

Source
DoD Comptroller President's Budget justification books, PB2020-PB2027
Grain
Budget line item x President's Budget year x fiscal year
Vintage
2026-08-24
Rows loaded
108,317

Path knowledge-bank/DOD-FM-Knowledge-Bank/11-Budget-Justification/_Archive · extracted 2026-09-19 04:53 · refresh annual, on publication of each President's Budget

Limitations The P-1R exhibit is National Guard and Reserve equipment already counted inside the P-1 lines, and R-1 rows marked Include-in-TOA = N sit outside total obligation authority; both are kept, flagged is_memo, and excluded from every total. Amounts are in thousands of dollars as published, are total obligation authority rather than outlays, and are not comparable to the execution files without ageing prior-year balances. The link from a weapons-book system to a budget line is derived from shared type designators or shared significant words -- neither source carries the other's key -- and every link records the evidence it rests on.

Amounts are total obligation authority as published in the exhibit, in thousands of dollars, converted here to dollars.

← the roster

What was asked for, what was appropriated, what was reported

Each President's Budget book restates three fiscal years: the prior year as actuals, the current year as enacted, and the budget year as requested. So this line appears in three successive books for the same fiscal year, and the three numbers differ. That difference is the restatement history, and it exists nowhere else in these sources.

FY2019 enacted
$6.4M
from the PB2020 book
Enacted for that year
$6.4M
as stated in the PB2020 book
Reported as actual
$6.4M
as stated in the PB2021 book
Request to enactment
—
Congress against the FY2019 request
Fiscal yearRequestedEnactedActualRequest → enactedEnacted → actualQuantity
FY2018——$5.2M · PB2020———
FY2019—$6.4M · PB2020$6.4M · PB2021—+0.0%—
FY2020$5.6M · PB2020$5.6M · PB2021$5.6M · PB2022+0.0%+0.0%—
FY2021$5.8M · PB2021$5.8M · PB2022$5.8M · PB2023+0.0%+0.0%—
FY2022$4.5M · PB2022$4.5M · PB2023$4.5M · PB2024+0.0%+0.0%—
FY2023$3.8M · PB2023$3.8M · PB2024$3.8M · PB2025+0.0%+0.0%—
FY2024$4.8M · PB2024$4.8M · PB2025$4.8M · PB2026+0.0%+0.0%—
FY2025$4.3M · PB2025$4.3M · PB2026$4.3M · PB2027+0.0%+0.0%—
FY2026$4.8M · PB2026$4.8M · PB2027—+0.0%——
FY2027$4.0M · PB2027—————

Read across, not down: one fiscal year as up to three books described it. The book year is shown beside each figure because the same number means different things depending on which book it came from.

Enacted as a share of what was requested

0%57%115%Appropriated as requestedFY20FY21FY22FY23FY24FY25FY26

Hover the line for a fiscal year.

The reference line is the request. Above it, Congress appropriated more than was asked for; below it, less. Neither is a finding on its own — a multiyear procurement, a rescission and a programme restructure all look like this from here.

Requested, by fiscal year

$0$3.3M$6.7MFY20FY21FY22FY23FY24FY25FY26FY27

Hover the line for a fiscal year.

Each point is the request in the book that made it, not a restated figure. A line that disappears was not requested in a later book we hold.

What makes up the FY2019 figure

The exhibit rows behind the number above, as published in the PB2020 book. Procurement lines are split by cost type — weapon system cost, advance procurement, subsequent full funding — and those parts are what the line's total is made of.

Cost typeAmountQuantityColumn readCounted
Weapon System Cost$6.4M—FY 2019 Total Enacted Amountyes

The fiscal-year figure was taken from the exhibit’s own total column for that year. Which rule applied is recorded per row and asserted by control EXH-05, because the exhibits change shape between eras and the broadest figure for a year is not always in the same column.

Into execution: the Treasury account this line is appropriated to

The exhibit account symbol and the Treasury account symbol differ only by the organisation letter, and that crosswalk is the whole bridge from a budget line into the execution files. What it reaches is an ACCOUNT, not a line item.

Fiscal yearBudgetary resources (D+R)Obligations (D+R)Direct (File B)Reimbursable (File B)Direct rateUnobligatedGross outlays
FY2021$5.7B$4.5B$4.4B$16.4M78.7%$1.2B$3.9B
FY2022$5.4B$4.3B$4.3B$5.7M78.6%$1.2B$3.7B
FY2023$6.6B$4.8B$4.8B$21.1M73.0%$1.8B$3.7B
FY2024$8.5B$5.3B$5.3B$38.5M63.0%$3.2B$4.1B
FY2025$13.4B$7.7B$7.6B$63.6M57.0%$5.7B$5.4B
FY2026 *$13.6B$7.9B$7.8B$54.3M59.4%$5.7B$5.4B

File A, Weapons Procurement, Navy. These are the whole account's figures — several budget lines share this account and File A states no split between them, so this is the ceiling this line was funded within, not this line's own execution.

This is the step where line-item precision is lost, and it is lost in the sources rather than here: File A is keyed to accounts and carries no budget line at all. An account obligation cannot be attributed to one of the budget lines inside it, and nothing on this page attempts to. A year marked * is period-to-date.

Into contracts

Two routes reach the contract file from here, and they answer different questions. The acquisition program code follows this system; the account set follows the appropriation.

By account named on the contract action, FY2026 — the newest year the contract file reaches, against a FY2019 budget year

ProgramAccounts named on the actionObligatedActions
TRIDENT II MISSILE017-1319 + 017-1507 + 017-1804 + 017-1810$236,5935
CVN 78017-1319 + 017-1506 + 017-1507 + 017-1611 + 017-1804 + 017-1810$02
TRIDENT II MISSILE017-1319 + 017-1507 + 017-1612 + 017-1804−$64,5042
TRIDENT II MISSILE017-1319 + 017-1507 + 017-1804−$940,2227
JASSM017-1507 + 057-3020 + 057-3600−$2.9M1
TRIDENT II MISSILE017-1319 + 017-1507 + 017-1804 + 017-1810 + 097-0400−$5.9M5

Read a row as: this much was obligated on actions that named this combination of accounts. The obligation is not split across the accounts in a set and is never summed by account — control PROG-02 asserts that.

How to read a figure on this page

Three numbers, one year. A fiscal year’s request, enactment and actual come from three different books and are three different claims. They are never averaged, reconciled away or shown as one figure here.

The chain narrows, then breaks. Budget line → Treasury account is exact. Account → execution is exact but no longer line-specific. Account → contract is a window onto the quarter of the contract file that carries a program code. The traceability page is about that break.

Quantity is what was bought, not what was funded. Advance procurement and subsequent full funding move money between years without moving units, which is why a quantity can stay flat while an amount moves by multiples.

Absence is absence in this cut. A blank cell means no book or file we hold covers that combination in the vintage named above — never that the Department did not report it.

Method and controls: EXH-01 through EXH-09 · sources · back to the roster

Built on public USASpending data and a curated DoD financial-management knowledge bank. No controlled unclassified information is present on this site, and none transits it. Every figure names its source and vintage; see Sources and Controls.

© 2026 datamatter