Budget line · P1 · National Guard and Reserve Equipment
Misc Equipment - Marine Corps Reserve
Line item 015005 in account 0350D (Treasury account 097-0350). Held in 7 President's Budget books, describing fiscal years 2018 through 2027.
- Source
- DoD Comptroller President's Budget justification books, PB2020-PB2027
- Grain
- Budget line item x President's Budget year x fiscal year
- Vintage
- 2026-08-24
- Rows loaded
- 108,317
Path knowledge-bank/DOD-FM-Knowledge-Bank/11-Budget-Justification/_Archive · extracted 2026-09-19 04:53 · refresh annual, on publication of each President's Budget
Limitations The P-1R exhibit is National Guard and Reserve equipment already counted inside the P-1 lines, and R-1 rows marked Include-in-TOA = N sit outside total obligation authority; both are kept, flagged is_memo, and excluded from every total. Amounts are in thousands of dollars as published, are total obligation authority rather than outlays, and are not comparable to the execution files without ageing prior-year balances. The link from a weapons-book system to a budget line is derived from shared type designators or shared significant words -- neither source carries the other's key -- and every link records the evidence it rests on.
Amounts are total obligation authority as published in the exhibit, in thousands of dollars, converted here to dollars.
What was asked for, what was appropriated, what was reported
Each President's Budget book restates three fiscal years: the prior year as actuals, the current year as enacted, and the budget year as requested. So this line appears in three successive books for the same fiscal year, and the three numbers differ. That difference is the restatement history, and it exists nowhere else in these sources.
| Fiscal year | Requested | Enacted | Actual | Request → enacted | Enacted → actual | Quantity |
|---|---|---|---|---|---|---|
| FY2018 | — | — | $13.0M · PB2020 | — | — | — |
| FY2019 | — | $13.0M · PB2020 | $13.0M · PB2021 | — | +0.0% | — |
| FY2021 | — | $17.5M · PB2022 | $17.5M · PB2023 | — | +0.0% | — |
| FY2023 | — | — | $18.0M · PB2025 | — | — | — |
| FY2024 | — | — | $23.0M · PB2026 | — | — | — |
| FY2025 | — | $19.6M · PB2026 | $19.6M · PB2027 | — | +0.0% | — |
| FY2026 | — | $22.0M · PB2027 | — | — | — | — |
| FY2027 | $23.0M · PB2027 | — | — | — | — | — |
Read across, not down: one fiscal year as up to three books described it. The book year is shown beside each figure because the same number means different things depending on which book it came from.
What makes up the FY2026 figure
The exhibit rows behind the number above, as published in the PB2027 book. Procurement lines are split by cost type — weapon system cost, advance procurement, subsequent full funding — and those parts are what the line's total is made of.
| Cost type | Amount | Quantity | Column read | Counted |
|---|---|---|---|---|
| Weapon System Cost | $22.0M | — | FY 2026 Total Amount | yes |
The fiscal-year figure was taken from the exhibit’s own total column for that year. Which rule applied is recorded per row and asserted by control EXH-05, because the exhibits change shape between eras and the broadest figure for a year is not always in the same column.
Into execution: the Treasury account this line is appropriated to
The exhibit account symbol and the Treasury account symbol differ only by the organisation letter, and that crosswalk is the whole bridge from a budget line into the execution files. What it reaches is an ACCOUNT, not a line item.
| Fiscal year | Budgetary resources (D+R) | Obligations (D+R) | Direct (File B) | Reimbursable (File B) | Direct rate | Unobligated | Gross outlays |
|---|---|---|---|---|---|---|---|
| FY2021 | $1.6B | $858.4M | $858.4M | $0 | 52.1% | $790.6M | $1.2B |
| FY2022 | $1.8B | $743.2M | $743.2M | $7,531 | 41.6% | $1.0B | $622.3M |
| FY2023 | $2.2B | $991.2M | $991.2M | $1,386 | 45.8% | $1.2B | $772.6M |
| FY2024 | $2.2B | $804.0M | $804.0M | $12 | 36.0% | $1.4B | $864.6M |
| FY2025 | $2.3B | $819.9M | $819.9M | $0 | 35.6% | $1.5B | $778.3M |
| FY2026 * | $2.3B | $860.1M | $860.1M | $0 | 37.0% | $1.5B | $662.2M |
File A, National Guard and Reserve Equipment Account, Defense. These are the whole account's figures — several budget lines share this account and File A states no split between them, so this is the ceiling this line was funded within, not this line's own execution.
This is the step where line-item precision is lost, and it is lost in the sources rather than here: File A is keyed to accounts and carries no budget line at all. An account obligation cannot be attributed to one of the budget lines inside it, and nothing on this page attempts to. A year marked * is period-to-date.
Into contracts
Two routes reach the contract file from here, and they answer different questions. The acquisition program code follows this system; the account set follows the appropriation.
By account named on the contract action, FY2026
No contract action in the FY2026 cut of the acquisition programs this site carries named 097-0350 among its funding accounts. The contract file is cut by acquisition program here, and roughly three quarters of DoD contract dollars carry no program code at all — so this is a narrow window, not a complete answer.
How to read a figure on this page
Three numbers, one year. A fiscal year’s request, enactment and actual come from three different books and are three different claims. They are never averaged, reconciled away or shown as one figure here.
The chain narrows, then breaks. Budget line → Treasury account is exact. Account → execution is exact but no longer line-specific. Account → contract is a window onto the quarter of the contract file that carries a program code. The traceability page is about that break.
Quantity is what was bought, not what was funded. Advance procurement and subsequent full funding move money between years without moving units, which is why a quantity can stay flat while an amount moves by multiples.
Absence is absence in this cut. A blank cell means no book or file we hold covers that combination in the vintage named above — never that the Department did not report it.
Method and controls: EXH-01 through EXH-09 · sources · back to the roster