Audit-risk object · Information technology

Configuration Management

Ten elements built at material weakness grain from the published audit record. Every element below says whether the cited document states it or this site read it out of the narrative — and none of them is an extracted Notice of Findings and Recommendations, because those are not public documents.

Source
DoD OIG annual audit-result reports FY2018-FY2025; GAO
Grain
Fiscal year; reporting entity; material weakness
Vintage
2026-09-12
Rows loaded
557

Path database/seed_nfr.json, built by scripts/build_nfr_seed.py · extracted 2026-09-19 04:55 · refresh annual

Limitations Individual NFRs are not public documents. Nothing here is an extracted notice: the OIG publishes counts and material weakness narratives, so the finest grain available is the material weakness. Every element records whether it is reported in the cited document or read out of it, and the outcome element is computed from the rosters rather than asserted. FY2018 is published at year grain only, because its per-entity table does not foot to its own published total. FY2023 publishes no roster.

On the published roster in 2 of 7 years, first FY2024, last FY2025.

Position

Outcome
Open
Computed from the 7 published rosters, not asserted
Years on the roster
2 of 7
First published FY2024
Titles it has been printed under
1
Unchanged across the record
What the sources on this site could testnot reachable here

IT general control evidence is internal to the systems and appears in no published financial file.

The ten elements

Read in order, these answer a different question from the report they come from: not what happened, but what a system built to prevent it would have to measure.

1

Financial statement / account

read

Pervasive, through the reliability of every system-generated balance and report.

Structured reading of DoD OIG report DODIG-2026-032, independent auditor’s report on the FY2025 financial statements

2

Assertion

read

Existence and completeness of system-generated data; the integrity of automated controls relied on in testing.

Structured reading of DoD OIG report DODIG-2026-032, independent auditor’s report on the FY2025 financial statements

3

Audit risk

read

An unauthorised or untested change alters posting logic or a report, and the balance changes without a transaction.

Structured reading of DoD OIG report DODIG-2026-032, independent auditor’s report on the FY2025 financial statements

4

Control

read

Change control: documented request, test, approval and migration, with production access separated from development.

Structured reading of DoD OIG report DODIG-2026-032, independent auditor’s report on the FY2025 financial statements

5

Control failure

read

Changes reached production without documented testing or approval, and change populations could not always be produced for testing.

Structured reading of DoD OIG report DODIG-2026-032, independent auditor’s report on the FY2025 financial statements

6

Root cause

read

The change population itself is not reliably captured. Where the change log is generated by the same system being changed, and the log can be edited by those who make the changes, there is no evidence that survives the control failing.

Structured reading of DoD OIG report DODIG-2026-032, independent auditor’s report on the FY2025 financial statements

7

Population / exposure

read

Not published at this grain.

Structured reading of DoD OIG report DODIG-2026-032, independent auditor’s report on the FY2025 financial statements

8

Historical audit evidence

read

Auditors requested change populations and tested samples for approval and testing evidence; incomplete populations are reported as scope limitations rather than exceptions.

Structured reading of DoD OIG report DODIG-2026-032, independent auditor’s report on the FY2025 financial statements

9

Remediation

read

Component-level change management corrective action plans. Reissued each year.

Structured reading of DoD OIG report DODIG-2026-032, independent auditor’s report on the FY2025 financial statements

10

Outcome

read

Open. On the roster in 2 of the 7 years a roster is published, first in FY2024, and carried into FY2025.

Computed from the published rosters, FY2018, FY2019, FY2020, FY2021, FY2022, FY2024, FY2025

Where it appeared, and what it was called

One row per published roster. A year absent from this table is a year in which this weakness was not on the roster, or — for FY2023 — a year for which no roster was published at all.

FYPrinted asRank in the reportCitation
FY2024Configuration Management15DoD OIG report DODIG-2025-112, "Part 2. Understanding the Results of the Audit of the FY 2024 DoD Financial Statements"
FY2025Configuration Management2DoD OIG report DODIG-2026-032, independent auditor’s report on the FY2025 financial statements

Rosters published for FY2018, FY2019, FY2020, FY2021, FY2022, FY2024, FY2025.

From this root cause to a system that can be audited

The first three steps come from the record above. The rest is a design, and is marked as one: nothing on this site evidences that any of it was built or that it works.

  1. 1

    Root cause

    from the record
    The change population itself is not reliably captured. Where the change log is generated by the same system being changed, and the log can be edited by those who make the changes, there is no evidence that survives the control failing.
  2. 2

    The business relationship that should hold

    from the record
    Every production change should have an approved, tested request that predates it.
  3. 3

    Data the relationship requires

    from the record
    Change request records, migration logs, production deployment timestamps.IT general control evidence is internal to the systems and appears in no published financial file.
  4. 4

    Rule

    design
    State the relationship as a testable condition over that data and run it over the whole population, not a sample. Every break is an exception with a transaction behind it. A rule that can only be evaluated on one side of the relationship is not a test of it, which is why step 3 has to come first and has to be honest about what is missing.
  5. 5

    Machine learning

    design
    Patterns the rule does not express: a break that appears only at a particular period end, a counterparty whose exceptions cluster, a value distribution that moves before a reconciliation fails. Trained on the exception history the rule produces, so the model has a labelled population rather than an unsupervised guess at what “unusual” means for this account.
  6. 6

    Language model

    design
    Explain a specific exception against the source records it was raised from, quoting them. Grounded in the retrieved evidence, never in the model’s own account of how the process works — an explanation that cannot name the record it rests on is not audit evidence.
  7. 7

    Automation

    design
    Route the exception to the accountable office, collect the supporting document, open the correction, and record what was done and by whom. The automation is the part that makes the control operate on a schedule rather than at year end under an auditor’s deadline.
  8. 8

    Monitoring

    design
    Measure whether the control performs: exception rate, time to clear, ageing of what is unresolved, and recurrence after closure. Recurrence after closure is the one that matters here, because the oversight weakness on this roster is precisely that a corrective action can be reported complete while the control it was meant to install never operates.
  9. 9

    Audit evidence

    design
    Retain the tested population, the exceptions, the investigation, the remediation and the control-performance history, each immutable and timestamped. The deliverable is not a dashboard. It is a package an auditor can test that demonstrates the control operated across the period.

The order is the argument. Building an anomaly detector for this account without steps 1 to 3 gives a model trained on whichever side of the relationship happens to be in a data lake, and it will find anomalies there — reliably, and without any of them being the failure the auditor reported. Materiality decides whether the work is worth doing, and the public record sizes this one no further than the roster it sits on: the reports name no population or dollar exposure at material weakness grain, so the decision to build has to be made on the balance, not on the finding.